Activity
"Component Leak Check
and
Electromechanical Checkout1
I. Summary
This activity is to insure the integrity of the steam generator
components. These preliminary component tests are required for:
1. Pressure Switch calibrations
2. Check Valve functional tests
3. Verification of orifice size and locations
4. Operational verification of proper sequencing
5. Safety System verification
II. Requirements
1. Local control of SGS Control System including cold checkout
device (trailer)
III. Reference
1. Test Report, SGS EP-I, NTO-R-0023
a. Page 3
b. Appendix III Change Requests10
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Staker, R. G.; Magnusson, A. W.; Powell, A. J.; Vandermeer, D. D. & Limbacher, D. L. E/STS 2 and 3 activation guide. Preliminary, report, April 17, 1967; Jackass Flats, Nevada. (https://digital.library.unt.edu/ark:/67531/metadc870579/m1/15/: accessed April 24, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.