Particle Accelerator Division Summary Report for May 1959 Through March 1960

PDF Version Also Available for Download.

Description

The procurement status of the ring magnet power supply is given. The effects of the magnet voltage regulation method on the power requirements, the r- f accelerating voltage, and the number of accelerating gaps are summarized. Harmonics of the power supply are calculated. Correlation of synchrotron osclllation frequencies to harmonic flux densities is made. The effect of duration DELTA t of flat topping on the motor and flywheel requirements under different conditions is calculated. Arc-back expectancies with 144 and 192 rectifiers for the power supply are given. The inner and outer vacuum chambers of the ring magnet are discussed. Spacemetal … continued below

Physical Description

57 pages

Creation Information

Creator: Unknown. October 31, 1960.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 17 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The procurement status of the ring magnet power supply is given. The effects of the magnet voltage regulation method on the power requirements, the r- f accelerating voltage, and the number of accelerating gaps are summarized. Harmonics of the power supply are calculated. Correlation of synchrotron osclllation frequencies to harmonic flux densities is made. The effect of duration DELTA t of flat topping on the motor and flywheel requirements under different conditions is calculated. Arc-back expectancies with 144 and 192 rectifiers for the power supply are given. The inner and outer vacuum chambers of the ring magnet are discussed. Spacemetal will be used for the inner vacuum chamber, because of its better outgassing performance. Outgassing measurements were made on AF-31 nitrilephenolic bonding film. Theoretical studies are summarized. The radiofrequency system, injection system, ring magnet coil, and auxiliary calculations are discussed. (For preceding period see ANL-6032.) (W.D.M.)

Physical Description

57 pages

Notes

NTIS

Other Information: Orig. Receipt Date: 31-DEC-60

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • October 31, 1960

Added to The UNT Digital Library

  • Sept. 16, 2016, 12:32 a.m.

Description Last Updated

  • Nov. 25, 2024, midnight

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 17

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Particle Accelerator Division Summary Report for May 1959 Through March 1960, report, October 31, 1960; Illinois. (https://digital.library.unt.edu/ark:/67531/metadc868186/: accessed May 21, 2025), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen