* Future y FutureGen Project Report
ALLIANCE
9.2 O PERATING SCHEDULE AND PROCESSING .........................................................................................9-2
9 .3 LIN E ITEM SU M M A RIES ..................................................................................................................9-3
10. POST-OPERATIONS AND PROJECT CLOSEOUT ..............................................................................10-1
11. ENGINEERING AND OPERATIONAL ASSESSM ENTS .......................................................................11-1
1 1 .1 V ALU E ENG IN EERING .................................................................................................................. 1 1-1
11.2 FACILITY DESIGN AND OPERATIONS EVALUATIONS ........................................................................... 11-3
11.3 EMISSIONS M ODELING AND PERMITTING ACTIVITIES........................................................................11-4
12. CO ST A N D RISK EVA LUATIO NS......................................................................................................12-1
13. SUM M ARY OF M AJOR ACCOM PLISHM ENTS.................................................................................13-1
Attachments
ATTACHMENT 1-SITE SELECTION REPORT
ATTACHMENT 2 - UNDERGROUND INJECTION CONTROL (UIC) PERMIT APPLICATION
ATTACHMENT 3 -DESIGN BASIS DOCUMENT
ATTACHMENT 4- CLEAN COAL REVIEW BOARD TECHNICAL REPORT
ATTACHMENT 5 -PROCESS FLOW DIAGRAMS AND HEAT & MATERIAL BALANCES FOR SLURRY-FED GASIFIER
ATTACHMENT 6 - PROCESS FLOW DIAGRAMS AND HEAT & MATERIAL BALANCES FOR DRY-FED GASIFIER
ATTACHMENT 7 -CAPITAL EXPENDITURE (CAPEX) COST ESTIMATE REPORT
ATTACHMENT 8 -OPERATING EXPENDITURE (OPEX) COST ESTIMATE REPORTDES-PDR-01
Page iv
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Cabe, Jim & Elliott, Mike. FutureGen Project Report, report, September 30, 2010; United States. (https://digital.library.unt.edu/ark:/67531/metadc868146/m1/4/?rotate=90: accessed April 19, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.