BEVATRON OPERATION AND DEVELOPMENT. XXVIII. Period Covered November 1960-January 1961

PDF Version Also Available for Download.

Description

The Bevatron operated an average of 80% of the scheduled operating time with the exception of one 5-day shutdown period for emergency maintenance of the motor generator sets. The machine was shut off l9% of the scheduled operating time because of component failure and 1% at the request of the user. During and following the Christmas shutdown period an ultrasonic inspection was made of the flywheel keyway on each of the motor generator sets. No faults were apparent. Charpy samples were taken from the inspection bore in the flywheels. Subsequent"vee notch" Charpy impact tests indicated that the flywheels are operated ... continued below

Physical Description

Pages: 13

Creation Information

Hartsough, W.D. & Salsig, W.W. May 1, 1961.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The Bevatron operated an average of 80% of the scheduled operating time with the exception of one 5-day shutdown period for emergency maintenance of the motor generator sets. The machine was shut off l9% of the scheduled operating time because of component failure and 1% at the request of the user. During and following the Christmas shutdown period an ultrasonic inspection was made of the flywheel keyway on each of the motor generator sets. No faults were apparent. Charpy samples were taken from the inspection bore in the flywheels. Subsequent"vee notch" Charpy impact tests indicated that the flywheels are operated in a brittle region rather than in the ductile range expected. The research program again was devoted mainly to study of pi - and K-meson interactions. (auth)

Physical Description

Pages: 13

Source

  • Other Information: Orig. Receipt Date: 31-DEC-61

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: UCRL-9671
  • Grant Number: W-7405-ENG-48
  • DOI: 10.2172/4027354 | External Link
  • Office of Scientific & Technical Information Report Number: 4027354
  • Archival Resource Key: ark:/67531/metadc867629

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • May 1, 1961

Added to The UNT Digital Library

  • Sept. 16, 2016, 12:32 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 1

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Hartsough, W.D. & Salsig, W.W. BEVATRON OPERATION AND DEVELOPMENT. XXVIII. Period Covered November 1960-January 1961, report, May 1, 1961; United States. (digital.library.unt.edu/ark:/67531/metadc867629/: accessed September 23, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.