ABWR QUARTERLY PROGRESS REPORT, JANUARY 1 TO MARCH 31, 1960. VOLUME I. SL- 1 OPERATIONS AND EVALUATION . VOLUME II. SL-1 HEALTH PHYSICS AND SAFETY

PDF Version Also Available for Download.

Description

The Stationary Low Power Reactor No. 1 is a three Mw boiling water reactor designed to demonstrate the feasibility of a nuclear reactor to supply electrical power and space heat for remote sites. In addition to performance evaluation the facility provides training for military personnel. The reactor was operated for 1159 hr during the quarter for a total core burnup of 20.3%. Power generation was 103.7 Mwd for a total power accumulation of 466.9 Mwd. Eight malfunctions occurred during the quarter for a total unscheduled downtime of 40 hr 44 min, As a result of malfunctions, aluminum keys will be … continued below

Physical Description

32 pages

Creation Information

Canfield, R. T.; Rausch, W. P.; Vallario, E. J.; Young, R. G. & Henderson, S. K. May 25, 1960.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 47 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The Stationary Low Power Reactor No. 1 is a three Mw boiling water reactor designed to demonstrate the feasibility of a nuclear reactor to supply electrical power and space heat for remote sites. In addition to performance evaluation the facility provides training for military personnel. The reactor was operated for 1159 hr during the quarter for a total core burnup of 20.3%. Power generation was 103.7 Mwd for a total power accumulation of 466.9 Mwd. Eight malfunctions occurred during the quarter for a total unscheduled downtime of 40 hr 44 min, As a result of malfunctions, aluminum keys will be installed on the control rod drives, instrument well covers were removed, and an order has been placed for a station auxiliaries breaker with a higher temperature rating. Data were taken on seven tests during the quarter. Four of these are expected to be completed during the next quarter. All equipment items on order for the SL-1 power extrapolation expansion program are scheduled to be delivered before June 15, 1960. Although condenser dampers and damper controls, process instrumentation, equipment cabinets, and the radiation monitoring equipment have not yet been ordered, construction will not be delayed. The two tie-ins to the existing reactor piping which were required have been made. The engineering and decontamination buildings are nearing completion and will be ready for occupancy in early May. An SL-l operational cost analysis for March of electrical power generated, based on military personnel only, indicated a mil rate of 107. (auth)

Physical Description

32 pages

Notes

Other Information: Orig. Receipt Date: 31-DEC-61

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • May 25, 1960

Added to The UNT Digital Library

  • Sept. 16, 2016, 12:32 a.m.

Description Last Updated

  • Nov. 21, 2024, 2:18 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 47

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Canfield, R. T.; Rausch, W. P.; Vallario, E. J.; Young, R. G. & Henderson, S. K. ABWR QUARTERLY PROGRESS REPORT, JANUARY 1 TO MARCH 31, 1960. VOLUME I. SL- 1 OPERATIONS AND EVALUATION . VOLUME II. SL-1 HEALTH PHYSICS AND SAFETY, report, May 25, 1960; United States. (https://digital.library.unt.edu/ark:/67531/metadc866922/: accessed December 7, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen