Revised FINAL–REPORT NO. 2: INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE ENRICO FERMI ATOMIC POWER PLANT, UNIT 1, NEWPORT, MICHIGAN (DOCKET NO. 50 16; RFTA 10-004) 2018-SR-02-1 Page: 1 of 57
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
OAK RIDGt INSTITUTE FOR SC EN'ICE kNZ ,C.D iPka o
October 7, 2O1 I
ir. "Theodore Smith
U.S. Nuclear Regulator Commission
Office of Federal and State Materials and Environmental Management Programs
11545 Rockville Pike
Mail Stop T-7 F27
Rockville, MD 20852
SUBJECT: REVISED FINAL-REPORT NO. 2: INDEPENDENT CONFIRMATORY
SURVEY SUMMARY AND RESULTS FOR THE ENRICO FERMI
ATOMIC POWER PLANT, UNIT 1, NEWPORT, MICHIGAN
(DOCKET NO. 50-16; RFTA 10-004)
DCN 2018-SR-02-1
Dear Nir. Smith:
The Oak Ridge Institute for Science and Education (ORISLI) is providing the enclosed revised
report that details the confirmatory survey acti-ities performed during the second ORISE site visit
to the Enrico Fermi Atomic Power Plant, Unit l (Fermi 1) in Newport, Michigan during the period
of November 1 through 4, 2010. This revision was necessary to correct footnote b of Table 4 with
the appropriate source efficiency (ej. A few additional grammatical/editorial corrections were made
as well.
Please direct any questions you may have to me via my information below or to Tim Vitkus at
865.576.5073.Sincerely,
/
Erika N. Bailey
Deputy Survey Projects Nlanager
Independent Environmental
Assessment and Verification
ENB:bj1 enclosure
c: S. Gebel, NRC/T\\FN 8F5
File/2018
electronic distribution: S. Roberts, ORISL\\. Snell, NRC
T. Vitkus, ORISEVoice: 863.576.6659
Fax: 865.241.3497
E-mail: Erika.Baileyorau.org
-. . *cxo1cr 27k 0, 7
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Bailey, Erika. Revised FINAL–REPORT NO. 2: INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE ENRICO FERMI ATOMIC POWER PLANT, UNIT 1, NEWPORT, MICHIGAN (DOCKET NO. 50 16; RFTA 10-004) 2018-SR-02-1, report, October 27, 2011; Oak Ridge, Tennessee. (https://digital.library.unt.edu/ark:/67531/metadc843707/m1/1/: accessed April 25, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.