Assessment of the Group 3-4 (HV-S1, HV-S2, IHLW-S1) Stack Sampling Probe Locations for Compliance with ANSI/HPS N13.1-1999

PDF Version Also Available for Download.

Description

This document reports on a series of tests conducted to assess the proposed air sampling locations for the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Group 3-4 exhaust stacks with respect to the applicable criteria regarding the placement of an air sampling probe. The HV-S1, HV-S2, and IHLW-S1 exhaust stacks were tested together as a group (Test Group 3-4) because they share a geometric attribute: the common factor in their design is that the last significant flow disturbance upstream of the air sampling probe is a jog (i.e., two conjoined bends of equal and opposite curvature resulting in a ... continued below

Physical Description

PDFN

Creation Information

Glissmeyer, John A.; Flaherty, Julia E. & Antonio, Ernest J. January 1, 2013.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

This document reports on a series of tests conducted to assess the proposed air sampling locations for the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Group 3-4 exhaust stacks with respect to the applicable criteria regarding the placement of an air sampling probe. The HV-S1, HV-S2, and IHLW-S1 exhaust stacks were tested together as a group (Test Group 3-4) because they share a geometric attribute: the common factor in their design is that the last significant flow disturbance upstream of the air sampling probe is a jog (i.e., two conjoined bends of equal and opposite curvature resulting in a change in elevation of the duct). Federal regulations require that a sampling probe be located in the exhaust stack according to criteria established by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. These criteria address the capability of the sampling probe to extract a sample that represents the effluent stream.

Physical Description

PDFN

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: PNNL-21998
  • Grant Number: AC05-76RL01830
  • DOI: 10.2172/1061407 | External Link
  • Office of Scientific & Technical Information Report Number: 1061407
  • Archival Resource Key: ark:/67531/metadc842791

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • January 1, 2013

Added to The UNT Digital Library

  • May 19, 2016, 9:45 a.m.

Description Last Updated

  • Dec. 6, 2016, 7:06 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 3

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Glissmeyer, John A.; Flaherty, Julia E. & Antonio, Ernest J. Assessment of the Group 3-4 (HV-S1, HV-S2, IHLW-S1) Stack Sampling Probe Locations for Compliance with ANSI/HPS N13.1-1999, report, January 1, 2013; Richland, Washington. (digital.library.unt.edu/ark:/67531/metadc842791/: accessed April 24, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.