MHD Advanced Power Train Phase I, Final Report, Volume 6

PDF Version Also Available for Download.

Description

Under contract to the Department of Energy, Westinghouse has prepared the definition of a program plan for the development of an MHD Advanced Power Train (APT). The scope of work of this contract includes conceptual designs of early commercial MHD/steam electric plants (topping/bottoming) ranging from 200 to 1000 Mw(e). These plant designs were prepared during 1982 and made use of a system analysis model that provides performance and design information and economic estimates. In early April 1984, DOE requested westinghouse to perform special studies under the existing APT contract to aid the Department in evaluating MHD program options. Two tasks ... continued below

Creation Information

Jones, A. R. August 1, 1985.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Under contract to the Department of Energy, Westinghouse has prepared the definition of a program plan for the development of an MHD Advanced Power Train (APT). The scope of work of this contract includes conceptual designs of early commercial MHD/steam electric plants (topping/bottoming) ranging from 200 to 1000 Mw(e). These plant designs were prepared during 1982 and made use of a system analysis model that provides performance and design information and economic estimates. In early April 1984, DOE requested westinghouse to perform special studies under the existing APT contract to aid the Department in evaluating MHD program options. Two tasks were defined by DOE: the first task was to evaluate an 80 MW(t) integrated test system (with steam electric bottoming cycle) for installation at the CDIF in Butte, Montana; the second task was to investigate placing a 50 MW(e) MHD topping stage onto an existing steam electric plant (as a retrofit). This volume of the final report documents the results of these special studies. Highlights of the studies were presented orally to DOE on May 15, 1984.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: DOE/PC/60575--T6-Vol.6
  • Grant Number: Ac22-83PC60575
  • DOI: 10.2172/1015967 | External Link
  • Office of Scientific & Technical Information Report Number: 1015967
  • Archival Resource Key: ark:/67531/metadc841933

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • August 1, 1985

Added to The UNT Digital Library

  • May 19, 2016, 3:16 p.m.

Description Last Updated

  • Dec. 6, 2016, 1:21 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 2

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Jones, A. R. MHD Advanced Power Train Phase I, Final Report, Volume 6, report, August 1, 1985; United States. (digital.library.unt.edu/ark:/67531/metadc841933/: accessed August 14, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.