D0 Silicon Upgrade: End Calorimeter Transfer Bridge Modification

PDF Version Also Available for Download.

Description

During the assembly of major components into the D0 Detector, a transfer bridge was required to move the North-End Calorimeter from the clean room,over the cable bridge and onto the north sidewalk of the assembly hall. This experiment is now at the beginning stages of the next phase, namely the upgrade of this Detector for future physics research. A major piece of this upgrade is the installation of a solenoid magnet into the Central Calorimeter. In order to accomplish this, the South End Calorimeter has to be removed from the detector and the North End Calorimeter must be moved an ... continued below

Physical Description

14 pages

Creation Information

Stredde, H.J. July 10, 1996.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

During the assembly of major components into the D0 Detector, a transfer bridge was required to move the North-End Calorimeter from the clean room,over the cable bridge and onto the north sidewalk of the assembly hall. This experiment is now at the beginning stages of the next phase, namely the upgrade of this Detector for future physics research. A major piece of this upgrade is the installation of a solenoid magnet into the Central Calorimeter. In order to accomplish this, the South End Calorimeter has to be removed from the detector and the North End Calorimeter must be moved an additional 20-inch from its nominal open position (total 60-inch movement). The South End Calorimeter will be removed from the detector using the equipment designed for its installation. The calorimeter will be staged on the south sidewalk during the installation of the solenoid magnet and the central tracking systems. The North End Calorimeter is moved 60-inch to give more space between calorimeters during magnet, tracker and cable installation work. This movement will allow the calorimeter to remain coupled to the cryo system. However, this movement requires an extension be added to the center beam. This extension will support the rear wheels of the calorimeter and in the case of the end calorimeters, carry the majority of the weight. The extension is to be a modification of the transfer bridge. This modification, basically has T1 steel blocks added to one end and legs to the sidewalk supports at the other. The T1 steel blocks are notched to fit into the center beam porches and are welded to bridge rails. This design is the same as that for the installation bridge (3740.312-ME-273456), including the welds and weld procedures which are identical in both cases. Since load testing is impractical, the critical welds will be non-destructive tested by ultrasonic means. The laboratory, through the FESS Department, has a contract with M.Q.S. Inspection Inc. The results of this testing will be submitted to the panel for review before the bridge is put into use. It is noted here, that M.Q.S. did perform an ultrasonic test on the critical welds of the EC-CC installation bridge on Oct. 2, 1990. That test demonstrated the weld penetrations between the T1 and A-36 materials. Copies were given to the committee at that time. A copy of the original North End Cap Calorimeter Installation Note is attached for reference.

Physical Description

14 pages

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: FERMILAB-D0-EN-452
  • Grant Number: AC02-07CH11359
  • DOI: 10.2172/1033279 | External Link
  • Office of Scientific & Technical Information Report Number: 1033279
  • Archival Resource Key: ark:/67531/metadc838209

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • July 10, 1996

Added to The UNT Digital Library

  • May 19, 2016, 3:16 p.m.

Description Last Updated

  • Aug. 30, 2016, 4:09 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 2

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Stredde, H.J. D0 Silicon Upgrade: End Calorimeter Transfer Bridge Modification, report, July 10, 1996; Batavia, Illinois. (digital.library.unt.edu/ark:/67531/metadc838209/: accessed October 17, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.