Commercialization Effort for 1W Consumer Electronics Power Pack

PDF Version Also Available for Download.

Description

A commercial ready fuel cell charger has been further developed, demonstrated, and field tested during the three phases of this project. The work performed and demonstrated has shown the commercialization readiness of this future product and underlying technology. The tasks in phase 1 of the project focused on component cost reduction, redesign for manufacturability, performance & reliability testing, and system integration. The end of phase 1 was completed on time and was signified by passing the Go/No-Go checkpoint. As shown in the report all technical metrics have been met or exceeded and the Go/No-Go checkpoint was passed in November of ... continued below

Physical Description

1.25MB

Creation Information

Carlstrom, Charles, M. June 29, 2011.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

A commercial ready fuel cell charger has been further developed, demonstrated, and field tested during the three phases of this project. The work performed and demonstrated has shown the commercialization readiness of this future product and underlying technology. The tasks in phase 1 of the project focused on component cost reduction, redesign for manufacturability, performance & reliability testing, and system integration. The end of phase 1 was completed on time and was signified by passing the Go/No-Go checkpoint. As shown in the report all technical metrics have been met or exceeded and the Go/No-Go checkpoint was passed in November of 2009. The tasks in phase 2 focused on tool fabrication and tooled component prove-out in working systems. The end of Phase 2 was the accomplishment of building working systems made almost completely of tooled components. The tasks in phase 3 of the project were preparing for and executing a 75 unit field test of the DMFC charger product developed in Phase 1 and phase 2. This field test demonstrated the functionality of the DMFC in the hands of real users while also providing feedback for potential design improvements. This was the first time a significant number of MTI units were put into the field to test usability and functionality. Feedback from the field test was positive and the units functioned well in the field.

Physical Description

1.25MB

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: DOE/EE0000477-1
  • Grant Number: EE0000477
  • DOI: 10.2172/1018346 | External Link
  • Office of Scientific & Technical Information Report Number: 1018346
  • Archival Resource Key: ark:/67531/metadc832898

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • June 29, 2011

Added to The UNT Digital Library

  • May 19, 2016, 3:16 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 2

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Carlstrom, Charles, M. Commercialization Effort for 1W Consumer Electronics Power Pack, report, June 29, 2011; United States. (digital.library.unt.edu/ark:/67531/metadc832898/: accessed October 15, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.