After the central calorimeter was installed on the center beam a cracked weld was found on the bridge. The weld was a partial penetration between the top rail plate and the T-1 steel nose section. The crack is fully across the width of the rail plate and the rail is depressed in a concave shape. That is, the depression is deeper in the center and feathers out to zero at the end of the rail. Upon close inspection it was obvious that there was no penetration of weld metal into the T-1 material. The assumption is that the T-1 was ... continued below

Physical Description

4 pages

Creation Information

Stredde, H. J. October 29, 1990.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

After the central calorimeter was installed on the center beam a cracked weld was found on the bridge. The weld was a partial penetration between the top rail plate and the T-1 steel nose section. The crack is fully across the width of the rail plate and the rail is depressed in a concave shape. That is, the depression is deeper in the center and feathers out to zero at the end of the rail. Upon close inspection it was obvious that there was no penetration of weld metal into the T-1 material. The assumption is that the T-1 was not properly pre-heated before welding. The reason for the concave depression comes from the fact that the rail plate rests on the flanges of the 'S' beams and that during welding the plate pulled off the beams. This weld failure can not propagate to any other welds and therefore, will not start a chain of failures. Clearly the failure of this weld did not hinder the installation of the central calorimeters. This weld failure occurred on both sides of the bridge. This failure did, however, alert us to check the critical weld on the bridge, S-beam webs to T-1 nose section, to assure us we had a sound weldment. (Note: it must be used again for both EC's). We contacted M.Q.S. Inspection Inc. (Lab contractor for N.D.T.). A technician from M.Q.S. came to DAB and performed an ultrasonic examination of the welds in question. The exam showed that we don't have a full penetration weld of the S Beam web, but that it is between 67-83%. A calculation was performed based on 67% penetration and the CC & EC loads. In both cases the weld stresses were well within acceptable limits (see calculations attached). Based on this result, it is not deemed necessary to modify the current weldment.

Physical Description

4 pages

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: FERMILAB-D0-EN-453
  • Grant Number: AC02-07CH11359
  • DOI: 10.2172/1033278 | External Link
  • Office of Scientific & Technical Information Report Number: 1033278
  • Archival Resource Key: ark:/67531/metadc830988

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • October 29, 1990

Added to The UNT Digital Library

  • May 19, 2016, 3:16 p.m.

Description Last Updated

  • Aug. 30, 2016, 4:07 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 2
Total Uses: 6

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Stredde, H. J. D0 Silicon Upgrade: Calorimeter Installation Bridge Non-Destructive Test Result, report, October 29, 1990; Batavia, Illinois. (digital.library.unt.edu/ark:/67531/metadc830988/: accessed October 22, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.