Development and determination of a single-shell tank interim stabilization pumping strategy

PDF Version Also Available for Download.

Description

This activity plan addresses the technique and steps involved in simulating a riser installation in the dome of a single-shell waste storage tank by the used of a rotary drill rig. This simulation will provide information to avoid potential inadequacies in planning and field efforts in a nonradiological environment. Personnel can be trained in a nonradiological environmental while perfecting techniques for drilling and installing risers. It is essential that field equipment and installation procedures be perfected before the installation of risers in SSTs occurs. Time spent installing the actual risers in the SSTs will be minimized, aiding in safety of ... continued below

Physical Description

60 p.

Creation Information

Garvin, L.J. & Kujak, S.K. June 12, 1995.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

This activity plan addresses the technique and steps involved in simulating a riser installation in the dome of a single-shell waste storage tank by the used of a rotary drill rig. This simulation will provide information to avoid potential inadequacies in planning and field efforts in a nonradiological environment. Personnel can be trained in a nonradiological environmental while perfecting techniques for drilling and installing risers. It is essential that field equipment and installation procedures be perfected before the installation of risers in SSTs occurs. Time spent installing the actual risers in the SSTs will be minimized, aiding in safety of personnel and conformance to ALARA principles.

Physical Description

60 p.

Notes

INIS; OSTI as DE95015819

Source

  • Other Information: PBD: 12 Jun 1995

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE95015819
  • Report No.: WHC-SD-WM-ES--345
  • Grant Number: AC06-87RL10930
  • DOI: 10.2172/89993 | External Link
  • Office of Scientific & Technical Information Report Number: 89993
  • Archival Resource Key: ark:/67531/metadc794499

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • June 12, 1995

Added to The UNT Digital Library

  • Dec. 19, 2015, 7:14 p.m.

Description Last Updated

  • Jan. 4, 2016, 1:21 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 2

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Garvin, L.J. & Kujak, S.K. Development and determination of a single-shell tank interim stabilization pumping strategy, report, June 12, 1995; United States. (digital.library.unt.edu/ark:/67531/metadc794499/: accessed September 24, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.