Mu-synthesis control of the EBR-II primary reactor system

PDF Version Also Available for Download.

Description

A robust {mu}-synthesis controller for the EBR-II reactor primary system and the DSNP simulations verifying the excellent robustness of the controller over a wide range of power are presented.

Physical Description

14 p.

Creation Information

Power, M. A.; Edwards, R. M. & Dean, E. June 1995.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Authors

  • Power, M. A.
  • Edwards, R. M. Pennsylvania State Univ., University Park, PA (United States). Nuclear Engineering Dept.
  • Dean, E. Argonne National Lab., Idaho Falls, ID (United States)

Sponsor

Publisher

  • Argonne National Laboratory
    Publisher Info: Argonne National Lab., Idaho Falls, ID (United States)
    Place of Publication: Idaho Falls, Idaho

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

A robust {mu}-synthesis controller for the EBR-II reactor primary system and the DSNP simulations verifying the excellent robustness of the controller over a wide range of power are presented.

Physical Description

14 p.

Notes

INIS; OSTI as DE95013419

Source

  • 9. symposium on power plant dynamics, control and testing, Knoxville, TN (United States), 24-26 May 1995

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Other: DE95013419
  • Report No.: ANL/ED/CP--84176
  • Report No.: CONF-950564--3
  • Grant Number: W-31-109-ENG-38
  • Office of Scientific & Technical Information Report Number: 88555
  • Archival Resource Key: ark:/67531/metadc793295

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • June 1995

Added to The UNT Digital Library

  • Dec. 19, 2015, 7:14 p.m.

Description Last Updated

  • Jan. 6, 2016, 5:02 p.m.

Usage Statistics

When was this article last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 4

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Power, M. A.; Edwards, R. M. & Dean, E. Mu-synthesis control of the EBR-II primary reactor system, article, June 1995; Idaho Falls, Idaho. (digital.library.unt.edu/ark:/67531/metadc793295/: accessed September 20, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.