The Experimental Boiling Water Reactor (EBWR), located on the Argonne National Laboratory-East (ANL-E) site, started operations in 1957. The initial rating was 20 MW(t). The rating was eventually increased to 70 MW(t) in 1959 and 100 MW(t) in 1962. The reactor was shut down in 1967 and all of the fuel was removed from the facility. The facility was placed in dry lay-up until 1986. ANL-E personnel started the decontamination and decommissioning (D&D) effort in 1986. Supporting equipment such as the external steam system and some of the upper reactor components, the core riser and the top fuel shroud, were ... continued below

Physical Description

3 p.

Creation Information

Sears, L.F. & Fellhauer, C. July 1, 1995.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 24 times . More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Authors

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

The Experimental Boiling Water Reactor (EBWR), located on the Argonne National Laboratory-East (ANL-E) site, started operations in 1957. The initial rating was 20 MW(t). The rating was eventually increased to 70 MW(t) in 1959 and 100 MW(t) in 1962. The reactor was shut down in 1967 and all of the fuel was removed from the facility. The facility was placed in dry lay-up until 1986. ANL-E personnel started the decontamination and decommissioning (D&D) effort in 1986. Supporting equipment such as the external steam system and some of the upper reactor components, the core riser and the top fuel shroud, were removed at that time. Characterization of the facility was also undertaken. The contract to complete the EBWR D&D Project was issued in December 1993. The initial schedule called for the final effort to be divided into five phases that were to be completed over a four year period. However, this schedule was subsequently consolidated, at the request of ANL-E, to a thirteen month period, with the on-site work to be completed by the end of 1994. The EBWR D&D Project is approximately 88% complete. A small quantity of reactor internals remains to be volume reduced along with the removal of the SFSP water treatment system. Upon completion of this work the facility will be decontaminated and a final survey completed. The planned completion of on-site work is scheduled for July 1995.

Physical Description

3 p.

Notes

INIS; OSTI as DE95013787

Source

  • 57. annual American power conference, Chicago, IL (United States), 18-20 Apr 1995

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Other: DE95013787
  • Report No.: ANL/TD/CP--85768
  • Report No.: CONF-950414--6
  • Grant Number: W-31-109-ENG-38
  • Office of Scientific & Technical Information Report Number: 93472
  • Archival Resource Key: ark:/67531/metadc792820

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • July 1, 1995

Added to The UNT Digital Library

  • Dec. 19, 2015, 7:14 p.m.

Description Last Updated

  • Jan. 6, 2016, 2:59 p.m.

Usage Statistics

When was this article last used?

Yesterday: 0
Past 30 days: 2
Total Uses: 24

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Sears, L.F. & Fellhauer, C. Decontamination and decommissioning of the Experimental Boiling Water Reactor at Argonne National Laboratory, article, July 1, 1995; Illinois. (digital.library.unt.edu/ark:/67531/metadc792820/: accessed January 17, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.