OLI/ESP Modeling Of The Semi-Integrated Pilot Plant For Estimate Of Campaigns I-IV Simulant Volumes

PDF Version Also Available for Download.

Description

Four SIPP campaigns have been planned to investigate the effect of recycle streams on the RPP-WTP pretreatment process such as the filter flux rate and other areas of interest. This document describes OLI/ESP modeling work done in support of the planning and operation of the SIPP. An existing OLI/ESP steady-state model was expanded to represent the pretreatment system through to the TLP evaporator for the LAW train and the washed sludge for the HLW train. The model was used to investigate alternative operating scenarios, determine the optimum volumetric waste feed ratio of AP-101 to AY-102, and, for each campaign, estimate ... continued below

Physical Description

vp.

Creation Information

CARL, BARNES August 1, 2004.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Four SIPP campaigns have been planned to investigate the effect of recycle streams on the RPP-WTP pretreatment process such as the filter flux rate and other areas of interest. This document describes OLI/ESP modeling work done in support of the planning and operation of the SIPP. An existing OLI/ESP steady-state model was expanded to represent the pretreatment system through to the TLP evaporator for the LAW train and the washed sludge for the HLW train. The model was used to investigate alternative operating scenarios, determine the optimum volumetric waste feed ratio of AP-101 to AY-102, and, for each campaign, estimate the simulant and input recycle volumes corresponding to the target glass production rates of 6MT/day HLW glass and 80MT/day LAW glass and scaled to the target of 140L of Campaign I washed sludge. It was designed to quickly achieve steady state and simulation results indicate this was accomplished by Campaign IV. The alternative operating scenarios modeled differed only in the point at which the AP-101 and AY-102 waste feed streams were introduced to the process. The results showed no difference in the production rate between the scenarios. Therefore, for these specific waste feeds the process should be operated to maximize the energy efficiency and minimize scaling in the evaporator by feeding the AY-102 waste feed to the ultra-filtration feed prep tank, bypassing the waste feed evaporator.

Physical Description

vp.

Source

  • Other Information: PBD: 1 Aug 2004

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: WSRC-TR-2004-00403, REV. 0
  • Grant Number: AC09-96SR18500
  • DOI: 10.2172/838624 | External Link
  • Office of Scientific & Technical Information Report Number: 838624
  • Archival Resource Key: ark:/67531/metadc787338

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • August 1, 2004

Added to The UNT Digital Library

  • Dec. 3, 2015, 9:30 a.m.

Description Last Updated

  • May 5, 2016, 5:48 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 3

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

CARL, BARNES. OLI/ESP Modeling Of The Semi-Integrated Pilot Plant For Estimate Of Campaigns I-IV Simulant Volumes, report, August 1, 2004; South Carolina. (digital.library.unt.edu/ark:/67531/metadc787338/: accessed September 20, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.