INITIAL TEST WELL CONDITIONING AT NOPAL I URANIUM DEPOSIT, SIERRA PENA BLANCA, CHIHUAHUA, MEXICO

PDF Version Also Available for Download.

Description

Three test wells, PB-1, PB-2, and PB-3, were drilled at the Nopal I uranium deposit as part of a natural analogue study to evaluate radionuclide transport processes during March-April 2003. The initial pumping to condition the wells was completed during December 2003. The PB-1 well, drilled immediately adjacent to the Nopal I ore body, was continuously cored to a depth of 250 m, terminating 20 m below the top of the measured water level. The PB-2 and PB-3 wells, which were drilled on opposite sides of PB-1 at a radial distance of approximately 40 to 50 m outside of the ... continued below

Creation Information

Oliver, R.D.; Dinsmoor, J.C.; Goldstein, S.J.; Reyes, I. & Garza, R. De La July 11, 2005.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Three test wells, PB-1, PB-2, and PB-3, were drilled at the Nopal I uranium deposit as part of a natural analogue study to evaluate radionuclide transport processes during March-April 2003. The initial pumping to condition the wells was completed during December 2003. The PB-1 well, drilled immediately adjacent to the Nopal I ore body, was continuously cored to a depth of 250 m, terminating 20 m below the top of the measured water level. The PB-2 and PB-3 wells, which were drilled on opposite sides of PB-1 at a radial distance of approximately 40 to 50 m outside of the remaining projected ore body, were also drilled to about 20 m below the top of the measured water level. Each test well was completed with 4-inch (10.2-cm) diameter PVC casing with a slotted liner below the water table. Initial conditioning of all three wells using a submersible pump at low pump rates [less than 1 gallon (3.8 1) per minute] resulted in measurable draw down and recoveries. The greatest drawdown ({approx}15 m) was observed in PB-2, whereas only minor (<1 m) drawdown occurred in PB-3. For PB-1 and PB-2, the water turbidity decreased as the wells were pumped and the pH values decreased, indicating that the contamination from the drilling fluid was reduced as the wells were conditioned. Test wells PB-1 and PB-2 showed increased inflow after several borehole volumes of fluid were removed, but their inflow rates remained less that the pumping rate. Test well PB-3 showed the smallest drawdown and least change in pH and conductivity during initial pumping and quickest recovery with a rise in measured water level after conditioning. The 195 gallons (750 l) of water pumped from PB-3 during conditioning was discharged through a household sponge. That sponge showed measurable gamma radiation, which decayed to background values in less than 12 hours. Preliminary interpretations include filtration of a radioisotope source with a short half-life or of a radioisotope that volatized as the sponge dried, such as Rn-222 and its short-lived daughters. No filtration was used during the pumping of PB-1 or PB-2.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: NA
  • Grant Number: NA
  • DOI: 10.2172/859188 | External Link
  • Office of Scientific & Technical Information Report Number: 859188
  • Archival Resource Key: ark:/67531/metadc786305

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • July 11, 2005

Added to The UNT Digital Library

  • Dec. 3, 2015, 9:30 a.m.

Description Last Updated

  • Feb. 10, 2016, 5:40 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 5

Interact With This Report

Here are some suggestions for what to do next.

Enlarge

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Oliver, R.D.; Dinsmoor, J.C.; Goldstein, S.J.; Reyes, I. & Garza, R. De La. INITIAL TEST WELL CONDITIONING AT NOPAL I URANIUM DEPOSIT, SIERRA PENA BLANCA, CHIHUAHUA, MEXICO, report, July 11, 2005; Las Vegas, Nevada. (digital.library.unt.edu/ark:/67531/metadc786305/: accessed June 17, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.