Abstract: This report documents the Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states. General observations regarding Federal/State siting roles in the siting process include: new regulations, with the exceptions of those imposed by NEPA, were not found to be the source of significant delay; interventions were the sources of significant delay in only two cases; in only two cases was a local agency a source of delay; no one factor was found to be a source of delay, rather several factors often combined to cause delay; it is still too early …
continued below
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Abstract: This report documents the Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states. General observations regarding Federal/State siting roles in the siting process include: new regulations, with the exceptions of those imposed by NEPA, were not found to be the source of significant delay; interventions were the sources of significant delay in only two cases; in only two cases was a local agency a source of delay; no one factor was found to be a source of delay, rather several factors often combined to cause delay; it is still too early to assess the influence of State power plant siting laws on the licensing process; clarification of the word "delay" is needed; water related issues predominate in State permitting requirements associated with delay; generalizations on the sources and nature of delay in the licensing process are difficult to make because of site specific characteristics; and frequently problems outside the Federal/State realm have had, or can have, a delaying effect on the process. Eleven of the case histories are illustrated with a logic network that gives the actions of the utilities in addition to the Federal/State permits.
This report is part of the following collection of related materials.
Technical Report Archive and Image Library
The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.
U.S. Nuclear Regulatory Commission. Office of State Programs.Federal/State Regulatory Permitting Actions in Selected Nuclear Power Station Licensing Cases,
report,
June 1977;
Washington D.C..
(https://digital.library.unt.edu/ark:/67531/metadc784370/:
accessed June 6, 2026),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.