Abstract: This report documents the Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states. General observations regarding Federal/State siting roles in the siting process include: new regulations, with the exceptions of those imposed by NEPA, were not found to be the source of significant delay; interventions were the sources of significant delay in only two cases; in only two cases was a local agency a source of delay; no one factor was found to be a source of delay, rather several factors often combined to cause delay; it is still too early … continued below

Physical Description

[147] p. : ill. ; 28 cm.

Creation Information

U.S. Nuclear Regulatory Commission. Office of State Programs. June 1977.

Context

This report is part of the collection entitled: Technical Report Archive and Image Library and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 61 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Distributor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Titles

Description

Abstract: This report documents the Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states. General observations regarding Federal/State siting roles in the siting process include: new regulations, with the exceptions of those imposed by NEPA, were not found to be the source of significant delay; interventions were the sources of significant delay in only two cases; in only two cases was a local agency a source of delay; no one factor was found to be a source of delay, rather several factors often combined to cause delay; it is still too early to assess the influence of State power plant siting laws on the licensing process; clarification of the word "delay" is needed; water related issues predominate in State permitting requirements associated with delay; generalizations on the sources and nature of delay in the licensing process are difficult to make because of site specific characteristics; and frequently problems outside the Federal/State realm have had, or can have, a delaying effect on the process. Eleven of the case histories are illustrated with a logic network that gives the actions of the utilities in addition to the Federal/State permits.

Physical Description

[147] p. : ill. ; 28 cm.

Notes

"6 in a series of 10."

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • OCLC: 604615070
  • SuDoc Number: Y 3.N 88:10/0200
  • Report No.: NUREG-0200
  • Archival Resource Key: ark:/67531/metadc784370

Collections

This report is part of the following collection of related materials.

Technical Report Archive and Image Library

The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • June 1977

Added to The UNT Digital Library

  • July 14, 2017, 6:39 a.m.

Description Last Updated

  • Feb. 19, 2026, 12:19 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 1
Total Uses: 61

Where

Geographical information about where this report originated or about its content.

Place Name

Map Information

  • map marker Place Name coordinates. (May be approximate.)
  • Repositioning map may be required for optimal printing.

Mapped Locations

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

U.S. Nuclear Regulatory Commission. Office of State Programs. Federal/State Regulatory Permitting Actions in Selected Nuclear Power Station Licensing Cases, report, June 1977; Washington D.C.. (https://digital.library.unt.edu/ark:/67531/metadc784370/: accessed June 6, 2026), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen