Long Term Stewardship Challenges at the St. Louis District FUSRAP Sites

PDF Version Also Available for Download.

Description

Non-Federally owned radioactively contaminated sites in St. Louis, Missouri are currently being remediated by the St. Louis District Corps of Engineers under the Formerly Utilized Sites Remedial Action Program (FUSRAP). When FUSRAP remediation is complete, inaccessible soils which have levels of contamination greater than unrestricted use standards, will remain. The purpose of this paper is to document the initial challenges facing the project team during its development of the Long Term Stewardship plan for the management of these soils. These soils are located under buildings, roads, railroads and bridges. The Long Term Stewardship plan for the majority of the sites ... continued below

Physical Description

8 pages

Creation Information

Dell'Orco, L. & Chambers, D. February 27, 2002.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

Non-Federally owned radioactively contaminated sites in St. Louis, Missouri are currently being remediated by the St. Louis District Corps of Engineers under the Formerly Utilized Sites Remedial Action Program (FUSRAP). When FUSRAP remediation is complete, inaccessible soils which have levels of contamination greater than unrestricted use standards, will remain. The purpose of this paper is to document the initial challenges facing the project team during its development of the Long Term Stewardship plan for the management of these soils. These soils are located under buildings, roads, railroads and bridges. The Long Term Stewardship plan for the majority of the sites is being developed simultaneously with the remedy selection process. A living document, it will ultimately document the remedial action end state and location of inaccessible soils and implement the plan for ensuring these soils are not a threat to human health and the environment. Although these soils are protective in their current configuration, at some point in time, when activities such as maintenance, utility or property improvement occur, the soils will become accessible and need to be addressed by the federal government. Up until that point in time they will need to be effectively managed to ensure they remain protective. The St. Louis District is in the process of collaboratively developing this plan with its regulators, affected stakeholders and interested parties.

Physical Description

8 pages

Source

  • Waste Management 2002 Symposium, Tucson, AZ (US), 02/24/2002--02/28/2002

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Report No.: none
  • Office of Scientific & Technical Information Report Number: 829566
  • Archival Resource Key: ark:/67531/metadc780015

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • February 27, 2002

Added to The UNT Digital Library

  • Dec. 3, 2015, 9:30 a.m.

Description Last Updated

  • April 27, 2016, 1:36 p.m.

Usage Statistics

When was this article last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 3

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Dell'Orco, L. & Chambers, D. Long Term Stewardship Challenges at the St. Louis District FUSRAP Sites, article, February 27, 2002; Tucson, Arizona. (digital.library.unt.edu/ark:/67531/metadc780015/: accessed August 20, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.