Implementation of the work program of Budget Period 2 of the East Binger Unit (''EBU'') DOE Project is progressing and nearing completion. EBU 63-2H has been drilled, completed, and brought on line. This is the second of three horizontal wells planned for this Budget Period, but based on the costs and performances to date of all new wells, could be the last. It will take some time to evaluate their impact on sweep and ultimate recovery. In addition to the drilling of new wells, the project also includes conversions of five wells from producers to injectors. Three wells were previously ... continued below

Physical Description

16 pages

Creation Information

Sinner, Joe November 5, 2003.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Implementation of the work program of Budget Period 2 of the East Binger Unit (''EBU'') DOE Project is progressing and nearing completion. EBU 63-2H has been drilled, completed, and brought on line. This is the second of three horizontal wells planned for this Budget Period, but based on the costs and performances to date of all new wells, could be the last. It will take some time to evaluate their impact on sweep and ultimate recovery. In addition to the drilling of new wells, the project also includes conversions of five wells from producers to injectors. Three wells were previously converted, and a fourth, EBU 37-3H, was prepared for conversion at the end of this reporting period. The fifth will require an expensive workover and will be re-evaluated. Project response to the various projects continues to be very favorable. Gas injection into the pilot area has increased from 4.0 MMscf/d prior to development to an average 7.3 MMscf/d in this reporting period, while gas production has actually decreased from 4.1 MMscf/d to 3.9 MMscf/d. The nitrogen content of produced gas has dropped from 58% to 52%. This has reduced the nitrogen recycle within the pilot area from 60% to 27%. Meanwhile, pilot area oil production has increased, from 300 bpd prior to development to over 600 bpd in September 2003. The pilot area oil rate will fall off as EBU 63-2H, which began producing new formation oil on September 6, declines to a stable rate.

Physical Description

16 pages

Notes

OSTI as DE00824741

Source

  • Other Information: PBD: 5 Nov 2003

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: NONE
  • Grant Number: FC26-00BC15121
  • DOI: 10.2172/824741 | External Link
  • Office of Scientific & Technical Information Report Number: 824741
  • Archival Resource Key: ark:/67531/metadc779673

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • November 5, 2003

Added to The UNT Digital Library

  • Dec. 3, 2015, 9:30 a.m.

Description Last Updated

  • Jan. 3, 2017, 2:25 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 2

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Sinner, Joe. IMPROVED MISCIBLE NITROGEN FLOOD PERFORMANCE UTILIZING ADVANCED RESERVOIR CHARACTERIZATION AND HORIZONTAL LATERALS IN A CLASS I RESERVOIR--EAST BINGER (MARCHAND) UNIT, report, November 5, 2003; United States. (digital.library.unt.edu/ark:/67531/metadc779673/: accessed November 17, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.