Rocky Flats Closure Project (Site) includes several multi-year decontamination and decommissioning (D&D) projects which, over the next four years, will dismantle and demolish four major plutonium facilities, four major uranium facilities, and over 400 additional facilities of different types. The projects are currently generating large quantities of transuranic, low-level, mixed, hazardous, and sanitary wastes. A previous paper described the initial conceptual estimates and methods, and the evolution of these methods based on the actual results from the decommissioning of a ''pilot'' facility. The waste estimating method that resulted from that work was used for the waste estimates incorporated into the ... continued below

Physical Description

14 pages

Creation Information

Sanford, P. C.; Templeton, J. H.; Stevens, J. L. & Dorr, K. February 25, 2002.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Sponsor

Publishers

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

Rocky Flats Closure Project (Site) includes several multi-year decontamination and decommissioning (D&D) projects which, over the next four years, will dismantle and demolish four major plutonium facilities, four major uranium facilities, and over 400 additional facilities of different types. The projects are currently generating large quantities of transuranic, low-level, mixed, hazardous, and sanitary wastes. A previous paper described the initial conceptual estimates and methods, and the evolution of these methods based on the actual results from the decommissioning of a ''pilot'' facility. The waste estimating method that resulted from that work was used for the waste estimates incorporated into the current Site baseline. This paper discusses subsequent developments on the topic of waste estimating that have occurred since the baseline work. After several months of operation under the current Site baseline, an effort was initiated to either validate or identify improvements to the waste basis-of-estimate. Specific estimate and estimating method elements were identified for additional analysis based on the element's potential for error and the impact of that error on Site activities. The analysis took advantage of actual, more detailed data collected both from three years additional experience in decommissioning a second plutonium facility and from experience in deactivating certain non-plutonium facilities. It compared the actual transuranic and low-level waste generation against their respective estimates based on overall distribution and for individual media (i.e. equipment type), and evaluated trends. Finally, it projected the quantity of lead-characteristic low-level mixed waste that will be generated from plutonium building decommissioning and upgraded the decommissioning waste estimates of the non-plutonium buildings.

Physical Description

14 pages

Source

  • Waste Management 2002 Symposium, Tucson, AZ (US), 02/24/2002--02/28/2002

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Report No.: NONE
  • Grant Number: none
  • Office of Scientific & Technical Information Report Number: 832814
  • Archival Resource Key: ark:/67531/metadc779098

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • February 25, 2002

Added to The UNT Digital Library

  • Dec. 3, 2015, 9:30 a.m.

Description Last Updated

  • April 26, 2016, 6:50 p.m.

Usage Statistics

When was this article last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 2

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Sanford, P. C.; Templeton, J. H.; Stevens, J. L. & Dorr, K. D&D Waste Estimate Validation, article, February 25, 2002; Tucson, Arizona. (digital.library.unt.edu/ark:/67531/metadc779098/: accessed October 16, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.