DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR Page: 4 of 12
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
TABLE OF CONTENTS
D IS C L A IM E R ..........................................................................................i
A B S T R A C T ...........................................................................................ii
TABLE OF CONTENTS...........................................................................iii
CONTRACT STATUS...............................................................................1
PROGRAM MANAGEMENT STATUS..........................................................2
SCHEDULE STATUS................................................................................2
SUBCONTRACTOR ACTIVITIES................................................................2
RELATED PROGRAM ACTIVITIES..............................................................3
TECHNICAL STATUS................................................................................4
DESIGN STATUS.....................................................................................4
FABRICATION STATUS............................................................................4
TESTING STATUS...................................................................................4
DELIVERABLES STATUS ..........................................................................5
ASSESSMENT OF OVERALL PROJECT OBJECTIVES.....................................5
RESULTS & DISCUSSION ..........................................................................5
C O N C L U S IO N S ......................................................................................5
D IS C L A IM E R ..........................................................................................6
SCHEDULE NO. 1 TITLED. OVERVIEW SCHEDULE FOR 10 MW GAS
GENERATOR TEST PROGRAM DTD 7/19/02.................................................7
FIGURE 1 - ASSEMBLED GAS GENERATOR .................................................8iii
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Baxter, E. W. DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR, report, June 30, 2002; Pittsburgh, Pennsylvania. (https://digital.library.unt.edu/ark:/67531/metadc742903/m1/4/: accessed April 24, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.