Description

The U.S. Department of Energy issued U.S. Department of Energy Order 435.1, Radioactive Waste Management, and U.S. Department of Energy Manual 435.1-1, Radioactive Waste Management Manual, on July 9, 1999, to replace U.S. Department of Energy Order 5820.2A. Compliance is required by July 9, 2000, where compliance is defined as ''implementing the requirements, or an approved implementation, or corrective action plan'' (refer to Manual, Introduction, paragraph four). This implementation plan identifies the status of each requirement for U.S. Department of Energy, Richland Operations Office Site contractors, and provides the plan, cost, and length of time required for achieving full implementation. ... continued below

Physical Description

99 pages

Creation Information

Fritz, D. W. June 1, 2000.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The U.S. Department of Energy issued U.S. Department of Energy Order 435.1, Radioactive Waste Management, and U.S. Department of Energy Manual 435.1-1, Radioactive Waste Management Manual, on July 9, 1999, to replace U.S. Department of Energy Order 5820.2A. Compliance is required by July 9, 2000, where compliance is defined as ''implementing the requirements, or an approved implementation, or corrective action plan'' (refer to Manual, Introduction, paragraph four). This implementation plan identifies the status of each requirement for U.S. Department of Energy, Richland Operations Office Site contractors, and provides the plan, cost, and length of time required for achieving full implementation. The U.S. Department of Energy, Richland Operations Office contractors (Fluor Hanford, Incorporated, DynCorp Tri-Cities Services, Bechtel Hanford, Inc., and Pacific Northwest National Laboratory) conducted a line-by-line review of DOE Order 435.1 and associated manuals to determine which requirements were new, and which requirements already are used for compliance with the previous DOE Order 5820.2A or other requirements. The Gap Analysis for DOE Order 435.1 (HNF-5465) identified compliance gaps, along with other issues that would impact efforts for achieving compliance. The gap analysis also contained a series of assumptions made by the various projects in determining compliance status. The details and section-by-section analysis are contained in Appendix A. Some of the DOE Order 435.1 requirements invoke sections of other DOE Orders not incorporated in various U.S. Department of Energy, Richland Operations Office contracts (refer to Section 2.0, Table 2-1). Those additional DOE Orders are identified by contractor and will be left for evaluation in accordance with each contractor's requirements. No attempt was made to evaluate all of those orders at this time, although in many cases, contractors follow a similar older DOE Order, which is cited in the Appendix. In some areas, the interpretation of the requirement is not clear, so clarifying assumptions have been made to assist the U.S. Department of Energy, Richland Operations Office in understanding the path forward planning basis. The assumptions and interpretations form the basis for the compliance gap analysis, as well as for the implementation plan itself as noted in Section 2.2. In some cases, the interpretation is essentially an exemption from a requirement, with the basis stated and justified. Some of the critical items in this area relate to the following: (1) Pre-existing waste; (2) Staging and storage; (3) Exemption of Comprehensive Environmental Response. Compensation. and Liability Act of 1980 remediation areas; (4) Contingency and confinement requirements for old facilities; (5) Siting and design requirement exemption for limited-lifetime facilities; (6) Waste with no identified path to disposal; and (7) Characterization, packaging, storage, certification, and monitoring requirements that might not satisfy the letter of DOE Order 435.1 but are justified fully in related safety, environmental, or monitoring documents.

Physical Description

99 pages

Notes

INIS; OSTI as DE00803915

Source

  • Other Information: PBD: 1 Jun 2000

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: DOE/RL-2000-25, Rev.1
  • Grant Number: AC06-96RL13200
  • DOI: 10.2172/803915 | External Link
  • Office of Scientific & Technical Information Report Number: 803915
  • Archival Resource Key: ark:/67531/metadc742702

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • June 1, 2000

Added to The UNT Digital Library

  • Oct. 19, 2015, 7:39 p.m.

Description Last Updated

  • May 3, 2016, 2:17 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 3

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Fritz, D. W. Richland Operations Office (DOE-RL) Implementation Plan for DOE Order 435.1, report, June 1, 2000; United States. (digital.library.unt.edu/ark:/67531/metadc742702/: accessed November 24, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.