Tank Farm Contractor Phase 1 Feed Delivery and Storage and Disposal Mission Summary for 2006 Hot Start Extended Order Page: 2 of 5
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
1. ECN (use no. from pg. 1)
ENGINEERING CHANGE NOTICE
Page2of 2 650558
16. Design Verification 17. Cost Impact 18. Schedule Impact (days)
Required ENGINEERING CONSTRUCTION
Q Yes Additional 5 $ Additional Q $ Improvement Q
No Savings Q $ Savings Q $ Delay
19. Change Impact Review: Indicate the related documents (other than the engineering documents identified on Side 1) that will be affected by
the change described in Block 13. Enter the affected document number In Block 20.
SDD/DD Q Seismic/Stress Analysis Q Tank Calibration Manual Q
Functional Design Criteria Q Stress/Design Report Q Health Physics Procedure Q
Operating Specification Q Interface Control Drawing Q Spares Multiple Unit Listing Q
Criticality Specification Q Calibration Procedure Q Test Procedures/Specification L
Conceptual Design Report Q Installation Procedure Q Component Index Q
Equipment Spec. Q Maintenance Procedure Q ASME Coded Item Q
Const. Spec. Q Engineering Procedure Q Human Factor Consideration L
Procurement Spec. Q Operating Instruction Q Computer Software Q
Vendor Information Q Operating Procedure Q Electric Circuit Schedule Q
OM Manual Q Operational Safety Requirement LiICRS Procedure Q
FSAR/SAR Q IEFD Drawing Q Process Control Manual/Plan Q
Safety Equipment List Q Cell Arrangement Drawing Q Process Flow Chart Q
Radiation Work Permit Q Essential Material Specification L Purchase Requisition Q
Environmental Impact Statement L Fac. Proc. Samp. Schedule Q Tickler File Q
Environmental Report Q Inspection Plan Q other
Environmental Permit Q Inventory Adjustment Request L Q
20. Other Affected Documents: (NOTE: Documents listed below will not be revised by this ECN.) Signatures below indicate that the signing
organization has been notified of other affected documents listed below.
Document Number/Revision Document Number/Revision Document Number/Revision
21. Approvals
Signature Date Signature Date
Design Authority Design Agent
Cog. Eng. T, J. Davis 2 S 'it PE
Cog. Mgr. R. w. Powell , 'Z _ QA
QA Safety
Safety Design
Environ. Environ.
Other Other
_DEPARTMENT OF ENERGY
Signature or a Control Number that tracks the
Approval Signature
ADDITIONAL
A-79DD-D13-3 (1D197)
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Davis, T. J. Tank Farm Contractor Phase 1 Feed Delivery and Storage and Disposal Mission Summary for 2006 Hot Start Extended Order, report, April 24, 2000; United States. (https://digital.library.unt.edu/ark:/67531/metadc742203/m1/2/: accessed April 24, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.