Plutonium Finishing Plant (PFP) HVAC System Component Index Page: 2 of 13
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
1. ECN (use no. from pg. 1)
ENGINEERING CHANGE NOTICE
Page2of 2 657656
18. Design Verification 17. Cost Impact 18. Schedule Impact (days)
Required ENGINEERING CONSTRUCTION
0 Yes Additional 0 $ N/A Additional 0 $ N/A Improvement Q N/A
No Savings 0 $ N/A Savings Q S N/A Delay 0 N/A
19. Change Impact Review: Indicate the related documents (other than the engineering documents identified on Side 1) that will be affected by
the change described in Block 13. Enter the affected document number in Block 2u.
SOD/DD Q Seismic/Stress Analysis Q Tank Calibration Manual Q
Functional Design Criteria Q Stress/Design Report Health Physics Procedure Q
Operating Specification Q Interface Control Drawing Q Spares Multiple Unit Listing Q
Criticality Specification Q Calibration Procedure Q Test Procedures/Specification Q
Conceptual Design Report Q Installation Procedure Q Component Index Q
Equipment Spec. Q Maintenance Procedure Q ASME Coded Item Q
Const. Spec. Q Engineering Procedure Q Human Factor Consideration Q
Procurement Spec. Q Operating Instruction Q Computer Software Q
Vendor Information Q Operating Procedure Electric Circuit Schedule Q
OM Manual Q Operational Safety Requirement Q ICRS Procedure Q
FSAR/SAR Q IEFD Drawing Q Process Control Manual/Plan Q
Safety Equipment List - Cell Arrangement Drawing Q Process Flow Chart Q
Radiation Work Permit Q Essential Material Specification E Purchase Requisition Q
Environmental Impact Statement Q Fac. Proc. Samp. Schedule E Tickler File Q
Environmental Report Q Inspection Plan Q None
Environmental Permit Q Inventory Adjustment Request E E
20. Other Affected Documents: (NOTE: Documents listed below will not be revised by this ECN.) Signatures below indicate that the signing
organization has been notified of other affected documents listed below.
Document Number/Revision Document Number/Revision Document Number/Revision
None
21. Approvals
Signature Date Signature Date
Design Authority J. D. Dick 2 Design Agent . _-
Cog. Eng. J. D. Dick (i ' PE _ , ,
Cog. Mgr. R',*j} Q2Z i0 QA
QA D.R.Groth 2'-2 22-O Safety
Safety Design
Environ. Environ.
Other Other
DEPARTMENT OF ENERGY
Signature or a Control Number that tracks the
Approval Signature
ADDITIONAL
A-7900-013-3 (10/97)
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
DICK, J.D. Plutonium Finishing Plant (PFP) HVAC System Component Index, report, February 28, 2000; United States. (https://digital.library.unt.edu/ark:/67531/metadc741798/m1/2/: accessed April 23, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.