'JU L 06fi 1999 ENGINEERING DATA TRANSMITTAL Page1 of
1. EDT 6 6 0
2. To: (Receiving Organization) 3. From: (Originating Organization) 4. Related EDT No.:
Distribution Technical Integration NA
7. Purchase Order No.:
5. Proj .Prog./Dept./Div.: 6. Design Authority/Design Agent/Cog. Engr.:
SNF Project/W-441 C. C. Pitkoff NA
______________________________________9. Equip./Component No.:
8. Originator Remarks: NA
For approval and release. 10. System/Bldg./Facility:
CVDF/142K
12. Major Assm. Dwg. No.:
11. Receiver Remarks: 11 A. Design Baseline Document? Q Yes No NA
13. Permit/Permit Application No.:
NA
14. Required Response Date:
15. DATA TRANSMITTED (F) (G) (H) (1)
Approal Rason Origi- Receiv-
ite (B) Document/Drawing No. (Sheet ( . (E) Title or Description of Data Transmitted esig- Roa Tras- Dispo- Diso-
No. .nator m ittal Dion sto
-stion sition
1 SNF-3061 All 0 CVDF Civil/Structural SDD NA 2 1
2 SNF-3066 All 0 CVDF Compressed Air SDD NA 2 1
4 SNF-3072 All 0 CVDF Crane SDD NA 2 1
5 SNF-3073 All 0 CVDF Effluent Drain SDD NA 2 1
6 SNF-3074 All 0 CVDF Condensate SDD NA 2 1
7 SNF-3077 All 0 CVDF Fire Protection SDD NA 2 1
16. KEY
Approval Designator (F) Reason for Transmittal (G) Disposition (H) & (1)
E, S, Q D OR N/A 1. Approval 4. Review 1. Approved 4. Reviewed no/comment
(See WHC-CM-3-5, 2. Release 5. Post-Review 2. Approved w/comment 5. Reviewed w/comment
Sec. 12.7) 3. Information 6. Dist. (Receipt Acknow. Required) 3. Disapproved w/comment 6. Receipt acknowledged
17. SIGNATUREIDISTRIBUTION
(See Approval Designator for required signatures)
So- Disp (J) Name (K) Signature (L) Date (M) MSIN Re -(H) (J) Name (K) Signature (L) Date (M) MSN
son p o
I Design Authority C. C. Pitkoff 3-8_6
Design Agent
1 / Cog.Eng. B Parker tAt 3-86
1 / Cog. Mgr. C.S7. Haller S3-386
3 QA S.L. Mischke R3-86
3 Safety- J.R. Brehm R3-29
Env.
18.19 20. 21. DOE APPROVAL (if required)
40P~JP' (o/c7AYF'1VI ~k): ,/~Jy] 44t~Ic.~</..iCtrl No. NA.
_M. J3 emers (' C. .Haller Q Approved
Signature of EDT Date Autho iz Representative Date Design Authority/ Date Q Approved w/comments
Originator for Re ing Organization Cognizant Manager O Disapproved w/comments
BD-7400-1 72-2prve w10/7omments-72BD-7400-172-2 (10/97)
B1D-7400-172.1
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
PITKOFF, C.C. Cold Vacuum Drying facility crane and hoist system design description (SYS 14), report, July 6, 1999; United States. (https://digital.library.unt.edu/ark:/67531/metadc741499/m1/1/: accessed April 17, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.