Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan Page: 1 of 10
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
JUL16 1999f
J U L 4 ENGINEERING DATA TRANSMITTAL 1.ED 6 .(
4 ~1. EDT 66 1
2. To: (Receiving Organization) 3. From: (Originating Organization) 4. Related EDT No.:
83100/TWRS Upgrades N/A
Distribution ________________
5. Proj./Prog./Dept./Div.: 6. Design Authority/ Design Agent/Cog. 7. Purchase Order No.:
Project W-420 Engr.: JH Bussell N/A
8. Originator Remarks: 9. Equip./Component No.:
Attached is the Year 2000 Compliance Assessment for Project N/A
W-420. 10. .System/Bldg./FaciLity:
Year 2000/241-G
11..Receiver Remarks: 11A. Design Baseline Document? ] Yes [X] No 12. Major Assm. Dwg. No.:
N/A
13. Permit/Permit Application No.:
N/A
14. Required Response Date:
N/A
15. DATA TRANSMITTED (F) (G) (H) (I)
(A) , (C) (D) Approval Reason Origi- Receiv-
Item (B) Document/Drawing No. Sheet Rev. (E Title or Description of Data Desig- for nator er
No. No. No. Transmitted nator Trans- Dispo- Dispo-
mittal sition sition
1 HNF-4072 N/A 0 Project W-420 Ventilation Stack NA 1,2 1 1
Monitoring System Upgrades Year
2000 Compliance Assessment Project
Plan
16. KEY
Approval Designator (F) Reason for Transmittal (G) Disposition (H) & (I)
E, S, Q, D or N/A 1. Approval 4. Review 1. Approved 4. Reviewed no/comment
(see WHC-CM-3-5, 2. Release 5. Post-Review 2. Approved w/comment 5. Reviewed w/comment
Sec.12.7) 3. Information 6. Dist. (Receipt Acknow. Required) 3. Disapproved w/comment 6. Receipt acknowledged
17. SIGNATURE/DISTRIBUTION
(See Approval Designator for required signatures)
(G) (H) (G) (H)
Rea- Disp. (J) Name (K) Signature (L) Date (M) MSIN Rea- Disp. (J) Name (K) Signature (L) Date (M) MSIN
son son
Design Authority
Design Agent Central Files 81-07
1,2 1 Cog.Eng. JR Russell R3-47 Y2K Project File H7-06
1,2 1 Cog. Mgr. KE Carpenter R3-47
QA
Safety
Env.
18. 19. tcc0 20. 21. DOE APPROVAL (if required)
-7 Ctrl. No.
JH Bussell : 8rC ..,ttr0"' ,Aa4~t (1 Approved
iif j w( Approved w/comments
signature of EDT Date A hoized Representative Date Design Author i/ Date [ Disapproved w/comments
Originator for Receiving Organization Cognizant ManagerBD-7400-172-2 (05/96) GEF097
BD-7400-172-1
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
BUSSELL, J.H. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan, report, August 25, 1999; United States. (https://digital.library.unt.edu/ark:/67531/metadc741493/m1/1/: accessed April 19, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.