Methyl chloride via oxyhydrochlorination of methane. Quarterly technical progress report No. 10, January 1944--March 1994

PDF Version Also Available for Download.

Description

In work related to the design and construction of the Process Development Unit (PDU) this quarter involved further detail design and a real start to the construction activities. Status updates are given below for each discipline in the Task 2.0 and 3.0 headings. This work is progressing well. with the caveat of several small slips in the scheduling. On the catalyst development front this quarter was extremely productive. Many catalyst screening experiments were completed and they showed that control of the reaction exotherm is going to be quite challenging under PDU conditions. The presence of much more efficient reactor design ... continued below

Physical Description

90 p.

Creation Information

Creator: Unknown. August 1, 1994.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

In work related to the design and construction of the Process Development Unit (PDU) this quarter involved further detail design and a real start to the construction activities. Status updates are given below for each discipline in the Task 2.0 and 3.0 headings. This work is progressing well. with the caveat of several small slips in the scheduling. On the catalyst development front this quarter was extremely productive. Many catalyst screening experiments were completed and they showed that control of the reaction exotherm is going to be quite challenging under PDU conditions. The presence of much more efficient reactor design and the ability to maintain closer to isothermal conditions is expected to give a significant advantage in actual PDU operation. A major concern at the moment is the cost of La in the catalyst being used. An action plan to remedy this is being put together.

Physical Description

90 p.

Notes

OSTI as DE95014337

Source

  • Other Information: PBD: Aug 1994

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE95014337
  • Report No.: DOE/PC/91030--T10
  • Grant Number: AC22-91PC91030
  • DOI: 10.2172/81092 | External Link
  • Office of Scientific & Technical Information Report Number: 81092
  • Archival Resource Key: ark:/67531/metadc739766

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • August 1, 1994

Added to The UNT Digital Library

  • Oct. 18, 2015, 6:40 p.m.

Description Last Updated

  • Nov. 24, 2015, 12:24 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 2

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Methyl chloride via oxyhydrochlorination of methane. Quarterly technical progress report No. 10, January 1944--March 1994, report, August 1, 1994; United States. (digital.library.unt.edu/ark:/67531/metadc739766/: accessed October 19, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.