In 1999, Engineering at Lawrence Livermore National Laboratory faced competing priorities to meet critical project milestones, insistent pressures to restructure internally to promote long-term technological growth, and immediate demands to reassign employees as major projects terminated and new ones emerged. This drive for change occurred among an unprecedented level of turmoil within the nuclear weapons design and manufacturing community. I believe the technical problems were more demanding this year and the environment within which they were accomplished more challenging, pushing us to accomplish more during greater turbulence than any other time in my tenure here. I am pleased to report ... continued below

Physical Description

15000 Kilobytes pages

Creation Information

Dimolitsas, S. & Gerich, C. April 11, 2000.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

In 1999, Engineering at Lawrence Livermore National Laboratory faced competing priorities to meet critical project milestones, insistent pressures to restructure internally to promote long-term technological growth, and immediate demands to reassign employees as major projects terminated and new ones emerged. This drive for change occurred among an unprecedented level of turmoil within the nuclear weapons design and manufacturing community. I believe the technical problems were more demanding this year and the environment within which they were accomplished more challenging, pushing us to accomplish more during greater turbulence than any other time in my tenure here. I am pleased to report that we met many key milestones and achieved numerous technological breakthroughs. In the project support areas, demands presented by our customers shifted significantly over the year. In the lasers area, we continued the detailed designs for the over $1 billion National Ignition Facility (NIF) super laser, paving the way for the procurement of components and structures for what is probably the largest high-tech construction project in the world. This work was undertaken in an environment of significant management and structural changes, with increased reporting requirements from the Department of Energy, starting in the middle of 1999. Despite these changes, our technical progress since 1995 has resulted in a 5000-fold improvement in the performance/cost characteristics of NIF--only a factor of 2 away from where we need to get. In the defense area, we delivered the first production unit of the refurbished W87 weapon, on schedule, for eventual delivery to the Air Force. Also in the defense area, we developed and implemented a new philosophy for conducting underground materials testing using expendable containment vessels. This allowed us to increase our test throughput rate six-fold and simultaneously reduce cost by a commensurate amount. The first two tests were conducted with a 100 percent data capture rate. came to an end. Within an intense three-month period, Engineering effectively transitioned its 150 employees working on this project to other Laboratory projects. We leveraged our competence in microsystems and biosciences to establish a robust technical presence in the field of biological and chemical weapons defense. This year, we saw successful operational tests of several hand-held versions of our analytical instruments. Concurrently, we saw our efforts in information technologies and medical devices pay off significantly, when both these areas grew robustly. In the operations area, Engineering underwent an important change in its technology investment strategy. In 1998, we consolidated our nine technical thrust areas into five Engineering Technology Centers and restructured these centers to form the Engineering Science and Technology Program, reporting directly to my office. In 1999, we completed the selection of four of the five Directors to lead each of these areas and moved from startup to true enterprise. This 1999 Summary highlights these five Centers.

Physical Description

15000 Kilobytes pages

Source

  • Other Information: PBD: 11 Apr 2000

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: UCRL-ID-131278-99
  • Grant Number: W-7405-Eng-48
  • DOI: 10.2172/791507 | External Link
  • Office of Scientific & Technical Information Report Number: 791507
  • Archival Resource Key: ark:/67531/metadc739054

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • April 11, 2000

Added to The UNT Digital Library

  • Oct. 19, 2015, 7:39 p.m.

Description Last Updated

  • May 6, 2016, 3:17 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 2

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Dimolitsas, S. & Gerich, C. Engineering Annual Summary 1999, report, April 11, 2000; California. (digital.library.unt.edu/ark:/67531/metadc739054/: accessed November 21, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.