The Safety Class Instrumentation and Control (SCIC) system provides active detection and response to process anomalies that, if unmitigated, would result in a safety event. Specifically, actuation of the SCIC system includes two portions. The portion which isolates the MCO and initiates the safety-class helium (SCHe) purge, and the portion which detects and stops excessive heat input to the MCO annulus on high Tempered Water (TW) inlet temperature. For the MCO isolation and purge, the SCIC receives MCO pressure (both positive pressure and vacuum), helium flow rate, bay high temperature switch status, seismic trip status, and time-under-vacuum trips signals. The ... continued below

Physical Description

97 pages

Creation Information

PHILIPP, B.L. September 4, 2000.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 16 times , with 4 in the last month . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The Safety Class Instrumentation and Control (SCIC) system provides active detection and response to process anomalies that, if unmitigated, would result in a safety event. Specifically, actuation of the SCIC system includes two portions. The portion which isolates the MCO and initiates the safety-class helium (SCHe) purge, and the portion which detects and stops excessive heat input to the MCO annulus on high Tempered Water (TW) inlet temperature. For the MCO isolation and purge, the SCIC receives MCO pressure (both positive pressure and vacuum), helium flow rate, bay high temperature switch status, seismic trip status, and time-under-vacuum trips signals. The SCIC system will isolate the MCO and start an SCHe system purge if any of the following occur. (1) Isolation and purge from one of the SCHe ''isolation'' and ''purge'' buttons is manually initiated (administratively controlled). (2) The first vacuum cycle exceeds 8 hours at vacuum, or any subsequent vacuum cycle exceeds 4 hours at vacuum without re-pressurizing the MCO for a minimum of 4 hours. (This is referred to as the 8/4/4 requirement and provides thermal equilibrium within the MCO.) (3) MCO is below atmospheric pressure and the helium flow is below the minimum required to keep hydrogen less than 4% by volume. (When MCO pressure is below 12 torr there is insufficient hydrogen to exceed the 4% level and therefore no purge is required. A five minute time delay on low flow allows flow to be stopped in order to reach < 12 torr.) (4) The duration for the transition from above atmospheric pressure to vacuum (time to reach pressure below -11.7 psig [{approx}155 torr]) exceeds 5 minutes. (5) The duration for the transition from vacuum (below -11.1 psig [{approx}185 torr]) back to pressure [greater than 0.5 psig] exceeds 5 minutes. (6) MCO reaches a vacuum state (<0.5 psig) without an adequate, verified purge volume. (The MCO must be maintained above atmospheric pressure (approximately 0.5 psig) to prevent oxygen ingress unless a purge of adequate volume has been completed. During bulk water draining, the MCO must remain above atmospheric pressure.) (7) Seismic event of sufficient magnitude is detected. (Trip point is below the Uniform Building Code levels). Setpoint determination is required for trips C through H. Sensor error determination for additional safety-significant sensors used by the HVAC system or the SCHe system are also required.

Physical Description

97 pages

Notes

OSTI as DE00804794

Source

  • Other Information: PBD: 4 Sep 2000

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: SNF-4451, Rev.3
  • Grant Number: AC06-96RL13200
  • DOI: 10.2172/804794 | External Link
  • Office of Scientific & Technical Information Report Number: 804794
  • Archival Resource Key: ark:/67531/metadc734764

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • September 4, 2000

Added to The UNT Digital Library

  • Oct. 18, 2015, 6:40 p.m.

Description Last Updated

  • April 21, 2016, 12:57 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 4
Total Uses: 16

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

PHILIPP, B.L. Cold Vacuum Drying (CVD) Set Point Determination, report, September 4, 2000; United States. (digital.library.unt.edu/ark:/67531/metadc734764/: accessed September 24, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.