Comparison Evaluation of the PFP FSAR and NRC Regulatory Guide 3.39 with DOE-STD-3009-94

PDF Version Also Available for Download.

Description

One of the Plutonium Finishing Plant's (PFP) current Authorization Basis (AB) documents is the Final Safety Analysis Report (FSAR). This FSAR (HNF-SD-CP-SAR-02 1) was prepared to the format and content guidance specified in U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide 3.39, Standard Format and Content of License Applications for Plutonium Processing and Fuel Fabrication Plants (RG 3.39). In April 1992, the US Department of Energy (DOE) issued DOE Order 5480.23 which established the FSAR requirements for DOE nonreactor nuclear facilities. In 1994, DOE issued DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports, which is ... continued below

Physical Description

115 pages

Creation Information

OSCARSON, E.E. July 28, 2000.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

One of the Plutonium Finishing Plant's (PFP) current Authorization Basis (AB) documents is the Final Safety Analysis Report (FSAR). This FSAR (HNF-SD-CP-SAR-02 1) was prepared to the format and content guidance specified in U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide 3.39, Standard Format and Content of License Applications for Plutonium Processing and Fuel Fabrication Plants (RG 3.39). In April 1992, the US Department of Energy (DOE) issued DOE Order 5480.23 which established the FSAR requirements for DOE nonreactor nuclear facilities. In 1994, DOE issued DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports, which is a format and content guide addressing the preparation of FSARs in accordance with DOE Order 5480.23. During the initial preparation and issuance of the PFP FSAR the format and content guidance contained in NRC Regulatory Guide 3.39 was utilized, since it was the most applicable guidance at the time for the preparation of Safety Analysis Reports for plutonium processing plants. With the adoption of DOE Order 5480.23 and DOE-STD-3009-94, DOE required the preparation of SARs to meet the format and content of those DOE documents. The PFP was granted an exemption to continue with RG 3.39 format for future FSAR revisions. PFP modifications and additions have required PFP FSAR modifications that have typically been prepared to the same NRC Regulatory Guide 3.39 format and content, to provide consistency with the PFP FSAR. This document provides a table comparison between the 3009 and RG 3.39 formats to validate the extent of PFP FSAR compliance with the intent of DOE Order 5480.23 and DOE-STD-3009-94. This evaluation was initially performed on Revisions 1 and 1A of the PFP FSAR. With the preparation of a Revision 2 draft to the FSAR, sections with significant changes were reevaluated for compliance and the tables were updated, as appropriate. The tables resulting from this comparison provide a ''road map'' between the RG 3.39 format of the PFP FSAR and the requirements of 3009, to verify compliance with 3009 and identify any discrepancies. Because of the format differences between the RG 3.39 and 3009 guidance, the extent to which the PFP FSAR complies with 3009 is not entirely clear. No comparative evaluation of the existing PFP OSRs to the requirements contained in Chapter 5 of 3009 was performed.

Physical Description

115 pages

Notes

INIS; OSTI as DE00804231

Source

  • Other Information: PBD: 28 Jul 2000

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: HNF-6533, Rev.0
  • Grant Number: AC06-96RL13200
  • DOI: 10.2172/804231 | External Link
  • Office of Scientific & Technical Information Report Number: 804231
  • Archival Resource Key: ark:/67531/metadc734375

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • July 28, 2000

Added to The UNT Digital Library

  • Oct. 19, 2015, 7:39 p.m.

Description Last Updated

  • May 3, 2016, 12:49 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 2
Total Uses: 8

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

OSCARSON, E.E. Comparison Evaluation of the PFP FSAR and NRC Regulatory Guide 3.39 with DOE-STD-3009-94, report, July 28, 2000; United States. (digital.library.unt.edu/ark:/67531/metadc734375/: accessed August 24, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.