This final report of the decontamination and decommissioning (D&D) of the Argonne National Laboratory-East (ANL-E) 60'' Cyclotron Accelerator Facility contains descriptions and evaluations of activities performed, and results obtained in connection with the Cyclotron D&D Project. It provides the following information: Objective of the Cyclotron D&D Project; A brief history of the Cyclotron facility; Overall descriptions of the Cyclotron facility and the ANL-E site; An overview of the D&D activities performed in connection with the Cyclotron D&D Project; Summary of the final status of the Cyclotron facility, including results of the final and confirmation surveys; Final cost and schedule for ... continued below

Physical Description

55 pages

Creation Information

Collins, E.; Boyance, J.; Tinnin, D. & Williams, A. March 19, 2001.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 11 times . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

This final report of the decontamination and decommissioning (D&D) of the Argonne National Laboratory-East (ANL-E) 60'' Cyclotron Accelerator Facility contains descriptions and evaluations of activities performed, and results obtained in connection with the Cyclotron D&D Project. It provides the following information: Objective of the Cyclotron D&D Project; A brief history of the Cyclotron facility; Overall descriptions of the Cyclotron facility and the ANL-E site; An overview of the D&D activities performed in connection with the Cyclotron D&D Project; Summary of the final status of the Cyclotron facility, including results of the final and confirmation surveys; Final cost and schedule for the Cyclotron D&D Project; Summaries of personnel exposure and total waste generated in connection with this project; and Final facility condition. This project final report was written in accordance with the requirements of the ANL-E D&D Project Planning Guidance Manual and the ANL-E D&D Program Management Plan. It covers the entire Cyclotron D&D Project, from the initiation of D&D activities to final project closeout. At the conclusion of the Independent Verification Survey (IVS), the Cyclotron facility was released for unrestricted reuse. Residual, elevated activity remains in inaccessible areas, however. The upper floor of the Cyclotron vault contains readily measurable radioactivity from neutron activation of the concrete and other structures resulting from Cyclotron operations. In accessible areas, the exposure rate criteria in DOE Order 5400.5, i.e., <20 {micro}R/hr, was met. No Radiation Work Permits (RWPs), radiation monitors, or other radiological controls are needed to enter the area. There is no planned use for the former Cyclotron vault and hot lab areas at this time. The issuance of this report signifies the conclusion of the Cyclotron D&D Project and the transfer of the Cyclotron facility from the U.S. Department of Energy (DOE) Environmental Management roster to the landlord.

Physical Description

55 pages

Source

  • Other Information: PBD: 19 Mar 2001

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: ANL/D& D/01-1
  • Grant Number: W-31-109-ENG-38
  • DOI: 10.2172/779799 | External Link
  • Office of Scientific & Technical Information Report Number: 779799
  • Archival Resource Key: ark:/67531/metadc725366

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • March 19, 2001

Added to The UNT Digital Library

  • Sept. 29, 2015, 5:31 a.m.

Description Last Updated

  • March 24, 2016, 6:40 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 11

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Collins, E.; Boyance, J.; Tinnin, D. & Williams, A. Decontamination and decommissioning of the 60-inch Cyclotron facility at Argonne National Laboratory-East project final report, report, March 19, 2001; Illinois. (digital.library.unt.edu/ark:/67531/metadc725366/: accessed June 21, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.