Russian Research Center "Kurchatov Institute"
Institute of Nuclear Reactors
VVER Division
Joint U.S. / Russian Project to Update, Verify and Validate
Reactor Design/Safety Computer Codes
Associated with Weapons-Grade Plutonium Disposition in VVER Reactors
Overall Plan for Physics Outlining Steps Necessary for Insertion of
the LTA and operation using a 1/3 MOX loaded core
General Order 85B-99398VProject Manager
A.M.Pavlovichev
Executed by
P.Alexeev
I.Levina
A.Makhonkov
V.Orlov
Y.Riabinine
Y.A.StyrineMoscow 2000
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Pavlovichev, A. M. Overall Plan for Physics Outlining Steps Necessary for Insertion of the LTA and Operation Using a 1/3 MOX Loaded Core, report, April 9, 2001; Tennessee. (https://digital.library.unt.edu/ark:/67531/metadc720906/m1/4/: accessed April 24, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.