Engineering report for project W-314 S/RID phase 1 assessment

PDF Version Also Available for Download.

Description

This report provides the results of an assessment of project W-314 compliance with project-specific SIRIDs. This Phase 1 assessment has been subdivided into the following tasks. Task 1 collected reference materials needed to complete the SIRID assessment. The documents include reports from the TWRS procedure compliance system (ERMI) that list the SIRID requirements for TWRS in each functional area and the documents that TWRS identified as implementing each SIRID (Phase 1 of the TWRS assessment). Also included are documents that were identified during this assessment as implementing project W-314 SIRIDs. Task 2 evaluated the 16 TWRS program SIRID functional areas ... continued below

Physical Description

51 pages

Creation Information

FRIBERG, A.H. May 24, 1999.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

  • Hanford Site (Wash.)
    Publisher Info: HNF Hanford Site (United States)
    Place of Publication: United States

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

This report provides the results of an assessment of project W-314 compliance with project-specific SIRIDs. This Phase 1 assessment has been subdivided into the following tasks. Task 1 collected reference materials needed to complete the SIRID assessment. The documents include reports from the TWRS procedure compliance system (ERMI) that list the SIRID requirements for TWRS in each functional area and the documents that TWRS identified as implementing each SIRID (Phase 1 of the TWRS assessment). Also included are documents that were identified during this assessment as implementing project W-314 SIRIDs. Task 2 evaluated the 16 TWRS program SIRID functional areas to identify areas that applied specifically to project W-314. The SIRIDs applicable to project W-314 were determined by evaluating each individual SIRID in each functional area against the scope of project W-314 from inception to the point at which it begins operation. The following project W-314 functional areas were then prioritized into three groups to allocate resources to the most critical items. Priority 1 SIRID functional areas contain requirements that pertain to activities done completely within the scope of project W-314 (engineering, quality assurance, and construction). Task 3 consisted of an assessment of each functional area, in priority sequence, to further refine the set of SIRIDs that apply to project W-314. This task involved determining, for each SIRID requirement, a document used on the project that implemented the requirement. This is analogous to a Phase I assessment under the SIRID program but tailored specifically to project W-314. A matrix was developed to document the results. All the SIRIDs were found to have suitable implementing documents.

Physical Description

51 pages

Notes

INIS; OSTI as DE00782291

Source

  • Other Information: PBD: 24 May 1999

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: HNF--3699--REV0
  • Grant Number: AC06-96RL13200
  • DOI: 10.2172/782291 | External Link
  • Office of Scientific & Technical Information Report Number: 782291
  • Archival Resource Key: ark:/67531/metadc718338

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • May 24, 1999

Added to The UNT Digital Library

  • Sept. 29, 2015, 5:31 a.m.

Description Last Updated

  • April 27, 2016, 4:41 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 2

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

FRIBERG, A.H. Engineering report for project W-314 S/RID phase 1 assessment, report, May 24, 1999; United States. (digital.library.unt.edu/ark:/67531/metadc718338/: accessed May 21, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.