Plutonium uranium extraction (PUREX) end state basis for interim operation (BIO) for surveillance and maintenance Page: 1 of 122
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
oA~ .~iii~
Ppre 1 of I
FEB 22 1999 ENGINEERING DATA TRANSMITTAL 1.EDT
2. To: (Receiving Organization) 3. From: (Originating Organization) 4. Related EDT No.:
Distribution FASTER Services 610377
610378
5. Proj ./Prog./Dept./Div.: 6. Design Authority/ Design Agent/Cog. 7. Purchase Order No.:
Engr.:
FASTER Services/Facility E. N. Dodd III N/A
Stabilization Project
8. Originator Remarks: 9. Equip./Component No.:
For approval and release. N/A
10. System/Bldg./Facility:
N/A
11. Receiver Remarks: 11A. Design Baseline Document? j Yes [X] No 12. Major Assm. Dag. No.:
N/A
13. Permit/Permit Application No.:
N/A
14. Required Response Date:
N/A
15. DATA TRANSMITTED (F) (G) (H) (I)
lA) ICI 1D) Approval Reason Origi- Receiv-
tem Sheet Rev. IE) Ttle or Description of Dta DesiO- for nator or
No. No. No. Transmitted nator Trans- Dispo- Dispo-
mittal sition sion
1 HNF-SD-CP-ISB-004 0 Plutonium Uranium E, S, 1,
Extraction (PUREX) D 2
End State Basis for
Interim Operation
(BIO) for
Surveillance and
Maintenance
16. KEY
Approval Designator IFl Reason for Transmttal 1G) Disposition IH) & (1)
E, S, , D or N/A 1. Approval 4. Review 1. Approved 4. Reviewed no/comment
(see WHC-CM-3-G, 2. Release 6. Post-Review 2. Approved w/comment 6. Reviewed w/comment
Sac.12.71 3. Information 8. Dist. (Receipt Acknow. Required) 3. Disapproved w/comment 6. Receipt cknowledged
17. SIGNATURE/DISTRIBUTION
See Approval OesigOnator for required signatures) _
Rea- pisp J) Name K) Signature IL) Date 1 S '' Rea- pisp. 1JI Nam IK) Signature (LI Date IMl
so . son 1j 4
Design Authority W. A. Peiffer ' 1.2 I R. W. Batiey ) I / 4.
Design Agent W. A. Peiffer 1.2 J. P. Hayfield r. 6 1
1, 2 ' Cog.Eng. E. N. Dodd III
1,2 I Cog. Mgr. N. A. Peiffer -J
QA
I Safety C. D. Wollam ( .
l I Env. G. J. LeBaronl $18. 19. 20. 2 ROVAL (if required)
tr. NoE APPALi
E d A. Pi r W.AP 4r , / pr O 97 D y3/
orson Yb sf1 pOt Opprige Ac /eonents
Signature of EDT ete Authorize Ors ti a Date Design Aut ri Date [] Disapproved W/comments
Originator for Receivin Org action Cognizant anBD-7400-172-2 (05/96) GEF097
BD-7400-172-1
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Dodd, E. N. Plutonium uranium extraction (PUREX) end state basis for interim operation (BIO) for surveillance and maintenance, report, May 12, 1999; United States. (https://digital.library.unt.edu/ark:/67531/metadc718019/m1/1/: accessed April 25, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.