INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS

PDF Version Also Available for Download.

Description

The fabrication drawings for the Advanced ElectroCore module and the water-cooled precharger were completed during this reporting period. The drawings were sent to four fabrication shops as part of a bid package. Of the three companies that chose to participate, the contract to fabricate the two components was awarded to Advanced Fabrication Services of Lemoyne, PA on 3 November 2000. Fabrication began the following week. The components are scheduled to be completed in mid to late January 2001. The design of the dry scrubber was delayed while the problem of low dew point spread in the exhaust stream was resolved. ... continued below

Physical Description

4 pages

Creation Information

Creator: Unknown. January 1, 2001.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Sponsor

Publishers

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The fabrication drawings for the Advanced ElectroCore module and the water-cooled precharger were completed during this reporting period. The drawings were sent to four fabrication shops as part of a bid package. Of the three companies that chose to participate, the contract to fabricate the two components was awarded to Advanced Fabrication Services of Lemoyne, PA on 3 November 2000. Fabrication began the following week. The components are scheduled to be completed in mid to late January 2001. The design of the dry scrubber was delayed while the problem of low dew point spread in the exhaust stream was resolved. The temperature of the exhaust gas from the outlet of the existing ESP is only 260 F. Some of the sorbents to be tested are liquid and therefore, the amount of sorbent that can be added before the exhaust gas reaches the due point is limited. The solution was to use a combustor to burn LPG and mix the two exhaust streams to get the desired temperature. Calculations indicated that burning LPG at the rate of 500,000 Btu/hr would be sufficient to raise the gas temperature to 400 F.

Physical Description

4 pages

Notes

OSTI as DE00788930

Source

  • Other Information: PBD: 1 Jan 2001

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: FC26-00NT40757--03
  • Grant Number: FC26-00NT40757
  • DOI: 10.2172/788930 | External Link
  • Office of Scientific & Technical Information Report Number: 788930
  • Archival Resource Key: ark:/67531/metadc715277

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • January 1, 2001

Added to The UNT Digital Library

  • Sept. 29, 2015, 5:31 a.m.

Description Last Updated

  • March 22, 2016, 1:38 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 2

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS, report, January 1, 2001; Pittsburgh, Pennsylvania. (digital.library.unt.edu/ark:/67531/metadc715277/: accessed October 17, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.