Engineering report for simulated riser installation Page: 3 of 183
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
WHC-SD-WM-ER-557, Rev. 0
ENGINEERING REPORT
SIMULATED RISER INSTALLATION
WORK ORDER E20017
Prepared for
Westinghouse Hanford Company
April 1996
Subcontract WHC 380393
Prepared by
ICF Kaiser Hanford Company
Richland, WashingtonE20017ER
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Brevick, C.H., Westinghouse Hanford. Engineering report for simulated riser installation, report, May 9, 1996; Richland, Washington. (https://digital.library.unt.edu/ark:/67531/metadc711873/m1/3/: accessed April 25, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.