List of equipment changes required for the production of various model sizes on the RMA and RMB lines, 234-5 Building

PDF Version Also Available for Download.

Description

In order to change models on the RM Line, a number of equipment items must be either replaced or modified. Some items may not necessarily require replacement depending upon the severity of the change. The attached list of items will require replacement or modification before production can be shifted from the present model to any of the others previously produced at this plant. The equipment is part of the Remote Mechanical A and B lines of the Plutonium Finishing Plant.

Physical Description

3 p.

Creation Information

Beaulieu, O.F. August 29, 1951.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

  • Hanford Works
    Publisher Info: Hanford Works, Richland, WA (United States)
    Place of Publication: Richland, Washington

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

In order to change models on the RM Line, a number of equipment items must be either replaced or modified. Some items may not necessarily require replacement depending upon the severity of the change. The attached list of items will require replacement or modification before production can be shifted from the present model to any of the others previously produced at this plant. The equipment is part of the Remote Mechanical A and B lines of the Plutonium Finishing Plant.

Physical Description

3 p.

Notes

OSTI as DE95011314

Source

  • Other Information: DN: Declassified

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE95011314
  • Report No.: HW--22031
  • Grant Number: AC06-76RL01830
  • DOI: 10.2172/71270 | External Link
  • Office of Scientific & Technical Information Report Number: 71270
  • Archival Resource Key: ark:/67531/metadc710081

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • August 29, 1951

Added to The UNT Digital Library

  • Sept. 12, 2015, 6:31 a.m.

Description Last Updated

  • May 3, 2016, 4:53 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 4

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Beaulieu, O.F. List of equipment changes required for the production of various model sizes on the RMA and RMB lines, 234-5 Building, report, August 29, 1951; Richland, Washington. (digital.library.unt.edu/ark:/67531/metadc710081/: accessed April 21, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.