1994 Baseline biological studies for the Device Assembly Facility at the Nevada Test Site Page: 1 of 43
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
DOE/NV/11432-177
UC-600DOE/NV/11432-177
UC-6001994 BASELINE BIOLOGICAL
STUDIES FOR THE DEVICE ASSEMBLY
FACILITY AT THE NEVADA
TEST SITE
Edited By:
Yvonne E. Townsend
February 1995
Work Performed Under
Contract No. DE-AC08-94NV11432
Prepared for the
U.S. Department of Energy
Nevada Operations Office
Prepared by:
Reynolds Electrical & Engineering Co., Inc.
Post Office Box 98521
Las Vegas, Nevada 89193-8521.tHo D-rr E " , t !
MASTER
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Townsend, Y.E.; Woodward, B.D.; Hunter, R.B.; Greger, P.D. & Saethre, M.B. 1994 Baseline biological studies for the Device Assembly Facility at the Nevada Test Site, report, February 1, 1995; Las Vegas, Nevada. (https://digital.library.unt.edu/ark:/67531/metadc709644/m1/1/: accessed March 29, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.