Utility advanced turbine systems (ATS) technology readiness testing. Technical progress report, January 1--March 31, 1998 Page: 4 of 74
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
ACRONYMS ................................................................................................................... A-1
SECTION 1 EXECUTIVE SUMMARY..............................................................................1
SECTION 2 TECHNICAL PROGRESS REPORTS: CURRENT TASKS .......................3
Section 2.2 (GT) Gas Turbine Design..............................................................................3
Section 2.2.2 (GTFF) Gas Turbine Flange-to-Flange Design.................................................3
Section 2.2.2.1 (GTFFCP) Compressor Design..................................................................3
Section 2.2.2.2 (GTFFCB) Combustor Design......................................................................4
Section 2.2.2.3 (GTFFTR) Turbine Rotor Design.................................................................6
Section 2.2.2.3.3 (GTFFTR) Rotor Steam Circuit Analysis.............................................. 6
Section 2.2.2.3.4 (GTFFTR) Turbine Rotor Shaft Temperature Analysis - #2 Bearing ..........7
Section 2.2.2.3.5 (GTFFTB) Bucket Temperature Monitoring..........................................8
Section 2.2.2.3.6 (GTFFTR) Rotor Component Flow Tests.............................................. 9
Section 2.2.2.4 (GTFFTB) Turbine Bucket Design.............................................................10
Section 2.2.2.4.4 (GTETIH) Bucket Tip Treatment Heat Transfer......................................10
Section 2.2.2.4.6 (GTETEH) S1B External Heat Transfer ..................................................11
Section 2.2.2.5 (GTFFTS) Turbine Stator Design...............................................................12
Section 2.2.2.6 (GTFFST) Structures Design .....................................................................13
Section 2.2.2.7 (GTFFMS) Mechanical System Design.......................................................14
Section 2.2.2.7.1 (GTFFMS) Transient Gas Turbine Cycle Model..................15
Section 2.2.2.8 (GTFFPP) On-Base and External Piping Design.........................................17
Section 2.2.2.9 (GTFFIT) Instrumentation and Test ...........................................................18
Section 2.2.3 (GTET) Technology Validation.....................................................................18
Section 2.2.3.1 (GTETNC) SIN D esign............................................................................18
Section 2.2.3.2 (GTETRS) Rotor Steam Transfer...............................................................18
Section 2.2.3.3 (GTETSE) Rotor-Bucket Steam Transfer Spoolie......................................19
Section 2.2.3.4 (GTETRH) Rotational Heat Transfer .................................................... 20
Section 2.2.3.4.1 (GTETRH) Rotational Effects on Bucket Mixing Ribs.............................20
Section 2.2.3.4.3 (GTETRH) - Rotating Trailing Edge Heat Transfer Tests.................... 21
Section 2.2.3.5 (GTETIH) Surface Enhanced Internal Heat Transfer ..............................21
Section 2.2.3.5.2 (GTETIH) S2B Trailing Edge Heat Transfer Tests..................................21
Section 2.2.3.5.8 (GTETIH) SiN Trailing Edge Heat Transfer Tests..............................22
Section 2.2.3.5.11 (GTETIH) Production Airfoil Flow Checks .......................................23i
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Utility advanced turbine systems (ATS) technology readiness testing. Technical progress report, January 1--March 31, 1998, report, August 1, 1998; United States. (https://digital.library.unt.edu/ark:/67531/metadc708815/m1/4/: accessed April 19, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.