This document is a reclamation plan for short-term and long-term stabilization of land disturbed by activities associated with interim clean-up of radionuclide-contaminated surface soil at the Double Tracks site. This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. Reclamation demonstration plots were established near the site in the fall of 1994 to evaluate the performance of several native species and to evaluate different irrigation strategies. Results of the study at Double Tracks, as well as the results from numerous studies conducted at other sites (Area 11 and ...
continued below
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
This document is a reclamation plan for short-term and long-term stabilization of land disturbed by activities associated with interim clean-up of radionuclide-contaminated surface soil at the Double Tracks site. This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. Reclamation demonstration plots were established near the site in the fall of 1994 to evaluate the performance of several native species and to evaluate different irrigation strategies. Results of the study at Double Tracks, as well as the results from numerous studies conducted at other sites (Area 11 and Area 19 of the Nevada Test Site), have been summarized and incorporated into this final reclamation plan for the interim cleanup of the Double Tracks site, located northwest of the Nevada Test Site on the Nellis Air Force Range. Surface soils at Double Tracks were contaminated as a result of the detonation of a device containing plutonium and depleted uranium using chemical explosives. The total amount of Pu deposited on the site was between 980 and 1,600 grams and was scattered downwind south of the detonation site. Short-term stabilization consists of the application of a chemical soil stabilizer that is applied immediately following excavation of the contaminated soils to minimize Pu resuspension. Long-term stabilization is accomplished by the establishment of a permanent vegetation.
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.
Double Tracks revegetation and monitoring plan,
report,
July 1, 1997;
United States.
(digital.library.unt.edu/ark:/67531/metadc706632/:
accessed April 22, 2018),
University of North Texas Libraries, Digital Library, digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.