Site acceptance test, W-030 MICON system

PDF Version Also Available for Download.

Description

Monitoring and control of the W-030 ventilation upgrade is provided by a distributed control system (DCS) furnished by MICON Corporation. After shipment to the Hanford Site, the site acceptance test (SAT) for this system was conducted in a laboratory environment over a six month period, involving four distinct phases and numerous hardware and software modifications required to correct test exceptions. The final results is a system which is not fully compliant with procurement specifications but is determined to meet minimum Project W-030 safety and functional requirements. A negotiated settlement was reached with the supplier to establish a `path forward` for ... continued below

Physical Description

251 p.

Creation Information

Hill, L.F., Westinghouse Hanford June 10, 1996.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

  • Westinghouse Hanford Company
    Publisher Info: Westinghouse Hanford Co., Richland, WA (United States)
    Place of Publication: Richland, Washington

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Monitoring and control of the W-030 ventilation upgrade is provided by a distributed control system (DCS) furnished by MICON Corporation. After shipment to the Hanford Site, the site acceptance test (SAT) for this system was conducted in a laboratory environment over a six month period, involving four distinct phases and numerous hardware and software modifications required to correct test exceptions. The final results is a system which is not fully compliant with procurement specifications but is determined to meet minimum Project W-030 safety and functional requirements. A negotiated settlement was reached with the supplier to establish a `path forward` for system implementation. This report documents the `as-run` status of the SAT. The SAT was completed in August of 1995. It was later followed by comprehensive acceptance testing of the W-030 control-logic configuration software; results are documented in WHC-SD-W030-ATR-011. Further testing is reported as part of process system startup operational testing, performed after the MICON installation.

Physical Description

251 p.

Notes

OSTI as DE98054209

Source

  • Other Information: PBD: 10 Jun 1996

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE98054209
  • Report No.: WHC-SD-W030-TRP--001
  • Grant Number: AC06-96RL13200
  • DOI: 10.2172/662041 | External Link
  • Office of Scientific & Technical Information Report Number: 662041
  • Archival Resource Key: ark:/67531/metadc706329

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • June 10, 1996

Added to The UNT Digital Library

  • Sept. 12, 2015, 6:31 a.m.

Description Last Updated

  • June 14, 2016, 6:10 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 7

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Hill, L.F., Westinghouse Hanford. Site acceptance test, W-030 MICON system, report, June 10, 1996; Richland, Washington. (digital.library.unt.edu/ark:/67531/metadc706329/: accessed October 15, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.