This system will be undergoing maintenance April 18th between 9:00AM and 12:00PM CDT.

Testing of high speed network components (RNET Project), with IBM and Bellsouth (91-0069), and testing of high speed network components (campus LAN project) with IBM (92-0124). Final CRADA report (Listing Multiple Pages).

Filename Size Format Download
672000.pdf 1.9 MB application/pdf Download
Back to Top of Screen