Proposed plan for the K-Area Bingham Pump Outage Pit (643-1G) Page: 1 of 44
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
1~
WSRC-RP-97-106, Rev. 1.1,
Proposed Plan for the K-Area Bingham Pump Outage Pit (643-1 G)
by
E. Palmer
Westinghouse Savannah River Company
Savannah River Site
Aiken, South Carolina 29808DOE Contract No. DE-AC09-96SR18500
This paper was prepared in connection with work done under the above contract number with the U. S.
Department of Energy. By acceptance of this paper, the publisher and/or recipient acknowledges the U. S.
Government's right to retain a nonexclusive, royalty-free license in and to any copyright covering this paper,
along with the right to reproduce and to authorize others to reproduce all or part of the copyrighted paper.MThiBUTMON OF 1"M DOOUME"T 3I UNl.sX!
MASTER
4
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Palmer, E. Proposed plan for the K-Area Bingham Pump Outage Pit (643-1G), report, June 1, 1997; Aiken, South Carolina. (https://digital.library.unt.edu/ark:/67531/metadc696279/m1/1/: accessed April 18, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.