Stressmeter placement at spent fuel test in climax granite

PDF Version Also Available for Download.

Description

Vibrating wire stressmeters were installed in the Spent Fuel Facility at the Nevada Test Site. These stressmeters will measure the changes in in situ stress during the five-year spent fuel test. Before installation, laboratory tests were conducted to study reproducibility of placement and to develop a program hopefully to reduce corrosion of the stressmeters while in place at the Spent Fuel Facility. These laboratory tests are discussed along with the installation of the stressmeters at the Spent Fuel Facility.

Physical Description

20 p.

Creation Information

Abey, A.E. & Washington, H.R. May 20, 1980.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Vibrating wire stressmeters were installed in the Spent Fuel Facility at the Nevada Test Site. These stressmeters will measure the changes in in situ stress during the five-year spent fuel test. Before installation, laboratory tests were conducted to study reproducibility of placement and to develop a program hopefully to reduce corrosion of the stressmeters while in place at the Spent Fuel Facility. These laboratory tests are discussed along with the installation of the stressmeters at the Spent Fuel Facility.

Physical Description

20 p.

Notes

NTIS, PC A02/MF A01

Source

  • Other Information: PBD: 20 May 1980

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: UCID--18629
  • Grant Number: W-7405-ENG-48
  • DOI: 10.2172/59211 | External Link
  • Office of Scientific & Technical Information Report Number: 59211
  • Archival Resource Key: ark:/67531/metadc691761

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • May 20, 1980

Added to The UNT Digital Library

  • Aug. 14, 2015, 8:43 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 4

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Abey, A.E. & Washington, H.R. Stressmeter placement at spent fuel test in climax granite, report, May 20, 1980; United States. (digital.library.unt.edu/ark:/67531/metadc691761/: accessed September 21, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.