Development and Testing of Industrial Scale, Coal-Fired Combustion System: Phase 3.

PDF Version Also Available for Download.

Description

In the first quarter of calendar year 1997, 17 days of combustor- boiler tests were performed, including one day of tests on a parallel DOE sponsored project on sulfur retention in a slagging combustor. Between tests, modifications and improvements that were indicated by these tests were implemented. This brings the total number of test days required to meet the task 5 project plan. The key project objectives in the areas of combustor performance and environmental performance have been exceeded. With sorbent injection in the combustion gas train, NO{sub x} emissions as low as 0.07 lb/MMBtu and SO{sub 2} emissions as ... continued below

Physical Description

18 p.

Creation Information

Zauderer, B. April 21, 1997.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

In the first quarter of calendar year 1997, 17 days of combustor- boiler tests were performed, including one day of tests on a parallel DOE sponsored project on sulfur retention in a slagging combustor. Between tests, modifications and improvements that were indicated by these tests were implemented. This brings the total number of test days required to meet the task 5 project plan. The key project objectives in the areas of combustor performance and environmental performance have been exceeded. With sorbent injection in the combustion gas train, NO{sub x} emissions as low as 0.07 lb/MMBtu and SO{sub 2} emissions as low as 0.2 lb/MMBtu have been measured in tests in this quarter. Tests in the present quarter have resulted in further optimizing the sorbent injection and NO{sub x} control processes. A very important milestone in this quarter was two successful combustor tests on a very high ash (37%) Indian coal. Work in the next quarter will focus on commercialization of the combustor- boiler system. In addition, further tests of the NO{sub x} and SO{sub 2} control process and on the Indian coal will be performed.

Physical Description

18 p.

Notes

OSTI as DE98054312

Other: FDE: PDF; PL:

Source

  • Other Information: PBD: 21 Apr 1997

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE98054312
  • Report No.: DOE/PC/91162--21
  • Grant Number: AC22-91PC91162
  • DOI: 10.2172/641273 | External Link
  • Office of Scientific & Technical Information Report Number: 641273
  • Archival Resource Key: ark:/67531/metadc691588

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • April 21, 1997

Added to The UNT Digital Library

  • Aug. 14, 2015, 8:43 a.m.

Description Last Updated

  • April 10, 2017, 2:12 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 2

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Zauderer, B. Development and Testing of Industrial Scale, Coal-Fired Combustion System: Phase 3., report, April 21, 1997; United States. (digital.library.unt.edu/ark:/67531/metadc691588/: accessed August 16, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.