Delivery and installation of PC/FRAM at the PNC Tokai Works Page: 6 of 21
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
DELIVERY AND INSTALLATION OF PC/FRAM
AT THE PNC TOKAI WORKS
by
Thomas E. Sampson, Thomas A. Kelley, Kenneth E. Kroncke,
Howard O. Menlove, and Jacobo Baca,
Takashi Asano, Shigeru Terakado, Yasushi Goto, and Noboru Kogawa
ABSTRACT
We report on the assembly, testing, delivery, installation, and initial testing of three
PC/FRAM plutonium isotopic analysis systems at the Power Reactor and Nuclear
Fuel Development Corporation's Tokai Works. These systems are intended to
measure the isotopic composition and 2"U/plutonium of mixed oxide (MOX) waste
in 200-L waste drums. These systems provide capability for performing
measurements on lead-lined drums.1
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Sampson, T. E.; Kelley, T. A.; Kroncke, K. E.; Menlove, H. O.; Baca, J.; Asano, Takashi et al. Delivery and installation of PC/FRAM at the PNC Tokai Works, report, November 1, 1997; New Mexico. (https://digital.library.unt.edu/ark:/67531/metadc690587/m1/6/: accessed April 24, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.