This report describes the simulation and analysis of solution level and density (L,D) in all key main process tanks in a large reprocessing plant. In addition, initial provisions were made to include temperature (T) data in the analysis at a later time. FacSim, a simulation program developed at Los Alamos, was used to generate simulated process operating data for the Rokkasho Reprocessing Plant (RRP) that is now under construction in Japan. Both normal facility operation and more than thirty abrupt diversion scenarios were modeled over 25-day periods of simulated operation beginning with clean startup of the facility. The simulation tracked ... continued below

Physical Description

49 p.

Creation Information

Burr, T.L.; Coulter, C.A. & Wangen, L.E. February 1, 1998.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

This report describes the simulation and analysis of solution level and density (L,D) in all key main process tanks in a large reprocessing plant. In addition, initial provisions were made to include temperature (T) data in the analysis at a later time. FacSim, a simulation program developed at Los Alamos, was used to generate simulated process operating data for the Rokkasho Reprocessing Plant (RRP) that is now under construction in Japan. Both normal facility operation and more than thirty abrupt diversion scenarios were modeled over 25-day periods of simulated operation beginning with clean startup of the facility. The simulation tracked uranium, plutonium (both +3 and +4 oxidation states), HNO{sub 3} diluent, and tributyl phosphate from the input accountability vessel to the plutonium output accountability vessel, with the status of each process vessel and many pipes recorded at intervals of approximately four minutes. These data were used to determine solution volume and density values in each process vessel as a function of time.

Physical Description

49 p.

Notes

INIS; OSTI as DE98003210

Source

  • Other Information: PBD: Feb 1998

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE98003210
  • Report No.: LA--13414-MS
  • Grant Number: W-7405-ENG-36
  • DOI: 10.2172/574241 | External Link
  • Office of Scientific & Technical Information Report Number: 574241
  • Archival Resource Key: ark:/67531/metadc689636

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • February 1, 1998

Added to The UNT Digital Library

  • Aug. 14, 2015, 8:43 a.m.

Description Last Updated

  • June 27, 2016, 12:36 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 4

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Burr, T.L.; Coulter, C.A. & Wangen, L.E. Benchmark data for a large reprocessing plant for evaluation of advanced data analysis algorithms and safeguards system design, report, February 1, 1998; New Mexico. (digital.library.unt.edu/ark:/67531/metadc689636/: accessed December 12, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.