This operability test procedure will verify that the 221-B beta/gamma liquid effluent monitoring system, installed near the east end of the six inch chemical sewer header, functions as intended by design. An off-line, skid mounted, beta/gamma radiation monitor and pH monitor was installed near stairwell three in the 221-B electrical gallery by Project W-007H. The skid mounted monitoring system includes two radiation detectors and a pH meter, both with local digital displays. Output signals from each monitor are also received and displayed by the Facility Process Monitor and Control System (FPMCS). Pumps, motors, gauges, valves and transport lines complement the ... continued below

Physical Description

22 p.

Creation Information

Weissenfels, R.D. February 24, 1995.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 15 times . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

  • Westinghouse Hanford Company
    Publisher Info: Westinghouse Hanford Co., Richland, WA (United States)
    Place of Publication: Richland, Washington

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

This operability test procedure will verify that the 221-B beta/gamma liquid effluent monitoring system, installed near the east end of the six inch chemical sewer header, functions as intended by design. An off-line, skid mounted, beta/gamma radiation monitor and pH monitor was installed near stairwell three in the 221-B electrical gallery by Project W-007H. The skid mounted monitoring system includes two radiation detectors and a pH meter, both with local digital displays. Output signals from each monitor are also received and displayed by the Facility Process Monitor and Control System (FPMCS). Pumps, motors, gauges, valves and transport lines complement the skid monitoring system. The system is part of BAT/AKART for the BCE liquid effluent system.

Physical Description

22 p.

Notes

INIS; OSTI as DE95008420

Source

  • Other Information: PBD: 24 Feb 1995

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE95008420
  • Report No.: WHC-SD-W007H-OTP--001
  • Grant Number: AC06-87RL10930
  • DOI: 10.2172/41266 | External Link
  • Office of Scientific & Technical Information Report Number: 41266
  • Archival Resource Key: ark:/67531/metadc687633

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • February 24, 1995

Added to The UNT Digital Library

  • July 25, 2015, 2:20 a.m.

Description Last Updated

  • Feb. 9, 2016, 10:37 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 15

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Weissenfels, R.D. Operability test procedure for the TK-900 beta/gamma liquid effluent monitoring system, report, February 24, 1995; Richland, Washington. (digital.library.unt.edu/ark:/67531/metadc687633/: accessed December 9, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.