Project W-320 acceptance test report for AY-farm electrical distribution Page: 4 of 61
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
ACCEPTANCE TEST PROCEDURE WHC-SD-W320-ATP-CC7
TEST TITLE AY-Farm Electrical Distribution System
LOCATION AY-Farm
PROJECT NUMBER W-320 WORK ORDER ER6159
PROJECT TITLE W-320 Tank 241-C-106 SluicingPrepared By
ICF Kaiser Hanford Company
Richland, Washington
For Westinghouse Hanford Company
Subcontract WHC-380393
PROCEDURE APPROVAL
ICf KAISER H "FORD COMPANY (ICF KH)
y/c 16 /Z kz
Auy r Date echnica Documen
Che ker ate Safety
Environmental te Quality Engineering
ject Man ement ateD-t
Date
Date
DateWestinghouse Hanford Company (WHC)
objects D Dite Q ljty ssura ce Date
Safety Date Operations Date
127
" _ yG?W320007.ATP.2558
- 1 -
WHC-SD-W320-ATR-007
Rev 0
04/15/9666A/
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Bevins, R.R. Project W-320 acceptance test report for AY-farm electrical distribution, report, April 2, 1998; Richland, Washington. (https://digital.library.unt.edu/ark:/67531/metadc687247/m1/4/: accessed April 25, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.