Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, March 13, 1996--June 12, 1996

PDF Version Also Available for Download.

Description

At this stage, the main emphasis is on the Field Demonstration phase of the project. The drilling portion of the Field Demonstration has been divided into two separate phases. We are currently proceeding with the drilling and completion of the first eleven Phase I wells. Locations for the additional seven Phase III wells were chosen at a Technical Committee meeting during the first week of June. Preliminary results have been very encouraging as all the wells are producing at or above their forecasted rates. Phase I includes the drilling of four producers and one injection well (10-acre nominal spacing) in ... continued below

Physical Description

18 p.

Creation Information

Creator: Unknown. June 12, 1996.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

At this stage, the main emphasis is on the Field Demonstration phase of the project. The drilling portion of the Field Demonstration has been divided into two separate phases. We are currently proceeding with the drilling and completion of the first eleven Phase I wells. Locations for the additional seven Phase III wells were chosen at a Technical Committee meeting during the first week of June. Preliminary results have been very encouraging as all the wells are producing at or above their forecasted rates. Phase I includes the drilling of four producers and one injection well (10-acre nominal spacing) in both the Section 329 study area and the Section 326/327 study area, as well as one producing well in Section 362. Phase I will be completed during the first week of July. Phase II drilling will involve the completion of the waterflood patterns to the west of the Phase I areas in Sections 329 and 327, consisting of two producers and one injection well in each area. The final Phase II well will be located near the southwest corner of Section 324, in an area of the Unit that remains relatively undrained. Producer-injection well conversions will be performed in this area, as well as other peripheral areas of the Unit to add needed water injection.

Physical Description

18 p.

Notes

OSTI as DE97003704

Source

  • Other Information: PBD: 12 Jun 1996

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Other: DE97003704
  • Report No.: DOE/BC/14989--9
  • Grant Number: FC22-94BC14989
  • DOI: 10.2172/451234 | External Link
  • Office of Scientific & Technical Information Report Number: 451234
  • Archival Resource Key: ark:/67531/metadc686296

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • June 12, 1996

Added to The UNT Digital Library

  • July 25, 2015, 2:21 a.m.

Description Last Updated

  • Nov. 10, 2015, 6:56 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 3

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, March 13, 1996--June 12, 1996, report, June 12, 1996; United States. (digital.library.unt.edu/ark:/67531/metadc686296/: accessed October 22, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.